Skip to main content

Marini mobile asphalt plant XPRESS 2500 P at Reykjavik Airport

Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction. The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind. However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, Colas is resurfacing the main runway and constructing a third strip and contracting other road works. The highway network i
May 17, 2017 Read time: 3 mins
Colas operates Marini’s XPRSS 2500 P for runway duty
Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction.


The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind.

However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, 184 Colas is resurfacing the main runway and constructing a third strip and contracting other road works.

The highway network is shaped around the natural features of a difficult and constantly changing – sometimes abruptly - environment. Around 60% of the road system is not asphalted while 35% has a single-surface treatment. Only 5% of the road network consists of traditional hot asphalt.

In 1987, Colas, a global road building company took the decision at its Denmark offices to establish an operational centre in Iceland. Now, of the 350,000tonnes of asphalt produced on the island annually, around 250,000tonnes are provided by Colas.

In the second half of 2015, Colas Denmark, including the Icelandic operations, conducted a technical-commercial market survey, aimed at pinpointing a new plant whose first task would be to re-qualify and expand Reykjavik’s airport. The work was to act as a benchmark for the company’s work on other building and maintenance projects on the island.

Fundamental for future asphalt plant on the island was good mobility on wheels, for quick and easy transfer but over rough terrain. The plant also had to have rapid installation to permit quick, low-cost relocation without the need of often unavailable heavy-lifting equipment.

Capacity of the plant had to be more than 200tonnes/hour to enable production in a short period of time. Also required was sufficient storage to permit uninterrupted production.

Finally, resistance, quality and reliability were important for an asphalt plant to ensure continuous production. Plant servicing in Iceland, both from the point of view of technical support and the supply of necessary spare parts, can be a problem.

The choice of a 273 Marini mobile plant, a 2500 P model from the XPRESS range, was the choice, according to Colas. It could produce 200tonnes/hour with 5% moisture in virgin aggregates. Also, all components were on individually wheel-mounted units with its own braking system to meet road circulation standards. Remaining components are housed and transported in a specific container.

The plant is self-erecting by way of a hydraulic system that lifts the main trailer into its working position. A small electric winch fitted onto the main trailer positions the screens and elevator into their final work stations. Structural integrity is assured through such initiatives as Marini Endurance, a high-wearing elevator with resistant REX chain.

In May 2016 Marini finally moved the machine out of the company workshop in Alfonsine, north-east Italy, and onto a ship at nearby Ravenna for its journey to Iceland. After a four-week sea journey and two weeks of testing, the unit was ready for work.

The first job awaiting the new XPRESS 2500 P has been the resurfacing of the new runway at Reykjavik airport, around 50km from the capital city and an important European tourist flight centre.

For more information on companies in this article

Related Content

  • Chinese quarry improving output with Sandvik machines
    July 15, 2016
    A Chinese quarry is using crushing equipment from Sandvik to help meet customer demand. This leading Chinese aggregate supplier has invested in four CH870 cone crushers supplied by Sandvik Construction. These up-to-date crushers have been acquired by the company to help produce high quality aggregate for the company’s customers’ increasing requirements. Zhongshan Xinlong Aggregate is located in Zhongshan City, Guangdong Province, China. From this and other locations, the company acts as a key producer and s
  • Ammann wins asphalt plant deal to Thailand
    January 6, 2017
    Ammann has won a significant order from a customer in Thailand for an asphalt plant at bauma China 2014. The plant is being supplied to a major Thai contractor, located around one hour’s journey from Bangkok. The customer has an older generation plant that will be retained, but is buying the newer and more sophisticated Ammann plant to help boost production.
  • Ammann wins asphalt plant deal to Thailand
    November 27, 2014
    Ammann has won a significant order from a customer in Thailand for an asphalt plant at bauma China 2014. The plant is being supplied to a major Thai contractor, located around one hour’s journey from Bangkok. The customer has an older generation plant that will be retained, but is buying the newer and more sophisticated Ammann plant to help boost production.
  • Mabey helps deliver bypass in congested UK city
    February 9, 2018
    The new Aberdeen Western Peripheral Route will cut journey times, reduce pollution costs and improve safety. Mabey has announced that its UK Hire business is working on a vital project to build a 58km bypass in Aberdeen. The Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T) project is being delivered by Transport Scotland in partnership with Aberdeen City Council and Aberdeenshire Council. Aberdeen Roads Limited was awarded the contract to build the AWPR/B-T in December 2014 and has appointed