Skip to main content

Major Pisa link gets upgrade

Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.
February 29, 2012 Read time: 3 mins
Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section.

The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.

The contractor is using a technique that meets Italian standards to client Pisa Province’s specification. The aim of the work is to improve the surface quality by repairing damage to the existing road.

Cold recycling has been used with foamed bitumen on sections with clearly identifiable damage and cracks in the surface, to produce a road surface 200mm thick. This features an 80mm asphalt binder layer and a 40mm asphalt wearing course. Cold recycling has been used to a depth of 100mm on those sections with less damage.

The cold planer makes an additional pass while any additional material, additives and foamed bitumen is sprayed into the mixing drum. Micro-processor controls ensure optimum metering of the sprayed additive when mixing with the pulverised material.

The processed material laid behind the machine is pre-compacted by a heavy screed and is followed by profiling with a grader and further compaction. By adding foamed bitumen, mixed material made from different natural additives or asphalt granulates can be turned into high-quality roads.

172 Bomag has developed the MPH125 recycling unit in collaboration with contractors and says that the machine is efficient and reliable and offers high performance for mixing lime, fly ash and cement for soil stabilisation. For cold planing, the unit can be used in multiple applications to pulverise old and damaged roads to stabilise the road.

The speed of the rotor is adjustable to match the job while the mixing drum adapts automatically to milling depth, the type of soil and materials used. Binder and soil can be processed to form a uniform mix with minimal wear and optimised energy consumption.

A high quality mix is created from the recycled materials when combined with water and binding agents and the new asphalt binder layer features good mechanical properties while the road's bearing capacity is improved, so there is no need to use reinforced structures. The uniform single-layer binder courses contain no weak points and there is less stress on the sub-base.

A recycling train can work in a single lane so that reconstruction can be carried out on half the carriageway and the entire road can be opened up again for traffic at the end of the shift.

A BOMAG Terrameter can carry out tests during cold recycling while work is ongoing. This unit automatically tests the bearing capacity of the asphalt layer during compaction, after which dynamic plate tests are applied.

Cold recycling can offer fast road repairs and as long as processes are adhered to, the technique offers a road repair with good mechanical properties and a long projected working life.

For more information on companies in this article

Related Content

  • High production recycling with Wirtgen
    July 14, 2021
    High throughput of quality material can be achieved using the latest KMA 240(i) unit from Wirtgen. The firm says that this unit allows material to be processed sustainably and close to the jobsite
  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus
  • Rainforest road repair and rehabilitation with stabilisation
    May 23, 2014
    A limited amount of aggregate and resources, including fuel, in the Riau province of Indonesia can challenge roadbuilders, but Indonesian contractor PT Harap Panjang overcame the obstacles on a recent project. The province rests in a tropical rainforest. The 2600mm of annual rainfall take a toll on the area’s roads, particularly those developed by oil company Chevron Pacific Indonesia. The remote roads were built to service Chevron operations, crucial to the economies of the city, region and country. The r
  • Latest bitumen mixes improve roads, reduce noise
    February 14, 2012
    Special bitumen mixes and machines are capable of improving the service life of roads and reducing noise. Mike Woof and Patrick Smith report. The need to improve traffic flow in an important part of the City of Poznan, Poland, led to the decision to build a new 1.13km long dual carriageway.