Skip to main content

Longer lasting surface on M40

The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques. Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.
February 28, 2012 Read time: 1 min
Using the new Rhinophalt material will boost roadway wear life on the UK's busy M40 motorway
The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques.

Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.

The preservative is being applied on a five year cycle covering the whole of the M40 motorway and started in June 2008 from Junction 10 northwards. In 2008 alone, over 800,000m² was preserved. Supplied by 3124 ASI Solutions, Rhinophalt protects an asphalt surface from weathering, oxidisation and traffic wear and minimises the deterioration of the bituminous surface.

Until now the use of preservatives for bituminous materials in the UK has been relatively uncommon, but the higher prices for asphalt has driven many local and national government agencies to look even harder at increasing value from budgets. Using a repair and preserve approach is seen as the way forward for asphalt surfaces ensuring value, good asset management and efficient whole life costing.

For more information on companies in this article

Related Content

  • Quarry operators improve on productivity
    February 13, 2012
    With capital expenditure plans being reduced, many quarry operators are using the funds available to improve on productivity with their existing equipment fleets. Claire Symes reports. The economic downturn has had a big impact on the aggregates production sector with many quarry operators looking to reduce costs and rationalise operations. The impact of this can be seen in the reduction of capital expenditure plans but the investments that are being made are focused on efficiency.
  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Performance-based contracts are the way forward World Bank expert tells PPRS Paris 2015
    February 27, 2015
    There “will never be sufficient funds for all planned road activities” says Ben Gericke, transport specialist at The World Bank. The road maintenance industry is going to have to use the best possible contract strategy to win the investment it needs. Speaking at the PPRS Paris 2015 pavement preservation and recycling summit, Gericke said that the best way for the global highway construction and road maintenance sector was to get its fair share of any national spending plan was to turn to performance-based c