Skip to main content

Longer lasting surface on M40

The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques. Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.
February 28, 2012 Read time: 1 min
Using the new Rhinophalt material will boost roadway wear life on the UK's busy M40 motorway
The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques.

Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.

The preservative is being applied on a five year cycle covering the whole of the M40 motorway and started in June 2008 from Junction 10 northwards. In 2008 alone, over 800,000m² was preserved. Supplied by 3124 ASI Solutions, Rhinophalt protects an asphalt surface from weathering, oxidisation and traffic wear and minimises the deterioration of the bituminous surface.

Until now the use of preservatives for bituminous materials in the UK has been relatively uncommon, but the higher prices for asphalt has driven many local and national government agencies to look even harder at increasing value from budgets. Using a repair and preserve approach is seen as the way forward for asphalt surfaces ensuring value, good asset management and efficient whole life costing.

For more information on companies in this article

Related Content

  • Help is on the way: RoadResource.org
    November 29, 2018
    RoadResource.org as a go-to website for surfacing information is now live, explains Doug Hogue, of VSS Macropaver When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the ope
  • Hitex launches BBA certified Puma road surfacing and marking range
    February 27, 2017
    Hitex International, a global provider of road safety and surfacing solutions, has introduced the Puma range of modified MMA (methyl methacrylate) high-friction surfacing and road marking materials. Hitex says that they are quicker and easier to apply and allow contractors to control the curing process to suit available workforce. This has the potential to speed up highway works and reduce traffic congestion.
  • Clean running haulers
    February 14, 2012
    Volvo Construction Equipment says that its all-new F-Series ADTs will meet the tough Tier 4 Interim/Stage IIIB emissions legislation as well as delivering performance improvements over previous models.
  • Morocco’s new motorway links are boosting connectivity
    December 16, 2014
    Morocco’s massive motorway construction programme will improve transport connections and boost this North African country’s economy - Mike Woof reports A massive road building programme is transforming Morocco, with new motorways connecting cities and major towns, as well as many new rural roads being built. The Moroccan Government has set an impressive plan for its infrastructure investment that will see even the country’s small and remote villages having proper connections to the main road network. The