Skip to main content

Longer lasting surface on M40

The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques. Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.
February 28, 2012 Read time: 1 min
Using the new Rhinophalt material will boost roadway wear life on the UK's busy M40 motorway
The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques.

Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.

The preservative is being applied on a five year cycle covering the whole of the M40 motorway and started in June 2008 from Junction 10 northwards. In 2008 alone, over 800,000m² was preserved. Supplied by 3124 ASI Solutions, Rhinophalt protects an asphalt surface from weathering, oxidisation and traffic wear and minimises the deterioration of the bituminous surface.

Until now the use of preservatives for bituminous materials in the UK has been relatively uncommon, but the higher prices for asphalt has driven many local and national government agencies to look even harder at increasing value from budgets. Using a repair and preserve approach is seen as the way forward for asphalt surfaces ensuring value, good asset management and efficient whole life costing.

For more information on companies in this article

Related Content

  • Protecting new asphalt overlay
    October 20, 2017
    Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani. For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to hand
  • High-tech, high places: 3M in US and MetService in New Zealand
    August 1, 2017
    The US state of Michigan sets up a high-tech test road while New Zealand’s transport officials buy in some high-tech weather forecasting. The road safety division of 3M will provide the US state of Michigan with lane markings and retroreflective signs for a connected vehicle technologies trial along the I-75 highway. Around 5km of the Interstate 75 work zone in Oakland County will be transformed over the next four months to improve safety for drivers and test advanced vehicle-to-infrastructure technologie
  • A macro website launched for microsurfacing processes
    October 9, 2018
    RoadResource.org as a go-to website for surfacing information is now live When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three major US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the opening day,” says the 51-year-old chartere
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.