Skip to main content

Longer lasting surface on M40

The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques. Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.
February 28, 2012 Read time: 1 min
Using the new Rhinophalt material will boost roadway wear life on the UK's busy M40 motorway
The UK's M40 motorway is benefiting from a new Rhinophalt surface, with over 160,000m² of the material having been applied. This preventative maintenance solution represents a move away from conventional replacement maintenance techniques.

Preserving the M40 with this asphalt treatment is the largest contract to date for the Rhinophalt solution.

The preservative is being applied on a five year cycle covering the whole of the M40 motorway and started in June 2008 from Junction 10 northwards. In 2008 alone, over 800,000m² was preserved. Supplied by 3124 ASI Solutions, Rhinophalt protects an asphalt surface from weathering, oxidisation and traffic wear and minimises the deterioration of the bituminous surface.

Until now the use of preservatives for bituminous materials in the UK has been relatively uncommon, but the higher prices for asphalt has driven many local and national government agencies to look even harder at increasing value from budgets. Using a repair and preserve approach is seen as the way forward for asphalt surfaces ensuring value, good asset management and efficient whole life costing.

For more information on companies in this article

Related Content

  • Preventive maintenance - preserving pavements
    February 14, 2012
    In the first article of a three-part series on preventive maintenance, Alan S. Kercher, of Kercher Engineering, highlights the value to road agencies of a properly implemented pavement preservation programme For many road agencies, the budget for maintenance, rehabilitation and reconstruction (MR&R) of their roads is focused mainly on the pavements that are in the worst condition. In the short term, this common approach may seem very logical. However, when focused on expensive structural improvements,
  • Rhinophalt roads - made to last
    April 3, 2013
    Ultracrete Rhinophalt is a cold spray-applied road surface preservation system that ensures the bitumen’s essential oils are not broken down by UV light. This means that the integrity of surface aggregate is not lost, cracks are not formed, and therefore water cannot penetrate the surface leading to eventual pothole formation. Now available through Instarmac’s Ultracrete brand following a strategic alliance with its manufacturers, ASI, Ultracrete Rhinophalt has been installed on many of the UK’s motorways
  • VIDEO: Rhinophalt from ASI boosts pavement waterproofing
    August 5, 2016
    UK-based ASI Solutions has produced a four-minute video that explains the workings of RHiNOPHALT, the company’s BBA Hapas approved and CE marked asphalt preservation solution. BBA is the British Board of Agrément, one of the UK’s leading notified bodies offering approval, certification and test services to manufacturers of products and systems supplying the construction industry. Hapas is the Highway Authorities Product Approval Scheme.
  • Successful pavement maintenance
    February 16, 2012
    This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc