Skip to main content

Lintec & Linnhoff ramps up Malaysia plant

The manufacturing facility in Johor, which began limited operation in 2021, covers 8,300m².
By David Arminas December 2, 2022 Read time: 2 mins
CNC plasma cutting (left) and welding (right) at the Lintec & Linnhoff factory in Johor, Malaysia (image courtesy Lintec & Linnhoff)

Lintec & Linnhoff says it has increased production at its newest asphalt and concrete batching plant in the Malaysian state of Johor.

The manufacturing facility, which began limited operation in 2021, covers nearly 8,300m² with two expansions planned.

Lintec & Linnhoff is manufacturing Linnhoff asphalt mixing plants and Eurotec concrete batching plants at the factory, which replaces the previous manufacturing site in northeastern Johor. Most of the production is going to customers in South-East Asia, the Middle East and Africa.

Plans for the new Malaysia facility were launched in 2019 and work was completed in 2021 after unavoidable interruptions caused by the Covid pandemic, explained Daniel Chan, chairman of Lintec & Linnhoff Holdings.

“Over the past two years, the whole world faced the challenge of COVID and many projects were put on hold. We faced our own roadblocks, but we were determined to bring our vision to life for this new Malaysian factory. Our first plants have already been delivered and the future is very bright,” said Chan.

The factory employs 50 and production can be shipped easily to customers across Asia, the Middle East and Africa via the three nearby ports. The new factory is also only 36km from the Lintec & Linnhoff global headquarters in Singapore.

The current facility is phase one of the planned development for the whole site that covers 26,200m².

Meanwhile, work has already started on the next phase of expansion that will add another 7,140m² of manufacturing area. The company said that the continued expansion is in line with its plans to manufacture Lintec containerised asphalt and concrete plants in the facility. Along with this, there will be further investment in additional equipment for the factory to increase production capacity and efficiency.

For more information on companies in this article

Related Content

  • Difficult decisions on projects in the UK
    November 25, 2022
    There are difficult decisions to be made on road projects in the UK.
  • Cambodian connection – construction completion
    May 13, 2022
    Completion of the contract to construct a new Cambodian connection is coming soon.
  • Easy operating
    July 31, 2012
    Modern asphalt plants are a far cry from the early models, and are capable of producing a wide variety of mixes at the touch of a button. Patrick Smith reports Cutting-edge software-based control technology makes today's asphalt mixing plants simple and efficient to operate. The tightening of clean air regulations is reducing the emissions from the plants, and the current focus is on the goal of raising the processed portion of reclaimed asphalt (RA) towards 100%, says Ammann Group, which has been involved
  • Strong first half 2022 for Wacker Neuson
    August 18, 2022
    Revenue in Europe for the first half-year rose 12.1 per cent relative to the previous year.