Skip to main content

Learning process

Sandvik has carried out a two day Quarry Academy for key senior industry personnel in Qatar. The event was used to discuss blasting and crushing solutions to meet demand for the large volume projects forecast for the region. The event was jointly sponsored by local distributors Q-FAB and Boodai and was attended by around 40 key senior management figures from Qatari contractors, quarry operators and drill and blast companies. The event was run as a continuous lecture-style presentation on the quarry process.
February 6, 2012 Read time: 2 mins
325 Sandvik has carried out a two day Quarry Academy for key senior industry personnel in Qatar. The event was used to discuss blasting and crushing solutions to meet demand for the large volume projects forecast for the region. The event was jointly sponsored by local distributors 2279 Q-FAB and 5823 Boodai Corporation and was attended by around 40 key senior management figures from Qatari contractors, quarry operators and drill and blast companies. The event was run as a continuous lecture-style presentation on the quarry process. This featured two key papers, the first covering factors from opening the quarry up to feeding rock to the crushing plant and the second describing the crushing process and introducing mobile crushers.

Upcoming projects such as the new Doha Port, specifying the movement of more than 50 million m3, have not been undertaken before in Qatar and are expected to pose challenges for local and international contractors. Blasting was another topic under discussion, in terms of the high volumes and how it can be handled by the authorities. Solutions were also presented in introducing new blasting techniques and Sandvik hydraulic top hammer drill rigs for the first time in Qatar. Crushing solutions involving the removal and processing high volumes of aggregates, sand and gravel including reuse on the project and stockpiling were also discussed in detail. In meeting the challenges posed by these high volume projects, emphasis on new crusher technology and techniques with mobile, jaw, impactors and screens, were also analysed with the presentation of new mobile impactors, heavy scalping screens and mobile jaw crushers.

For more information on companies in this article

Related Content

  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Recycling road gully waste
    September 26, 2013
    Recycling waste gully materials can save costs and also meet tough European sustainability requirements, with one firm offering a novel solution The effects of the Landfill Directive together with the annual increase in Landfill Tax have significantly increased the cost of disposal of gully waste. This is currently around £50/tonne but is expected to rise to £80/tonne in 2014 in the UK, although other parts of Europe may differ. As a consequence, this has increased the operating costs for companies pro
  • Qatar to spend up to $100 billion on road and rail networks before FIFA World Cup
    February 29, 2012
    According to Business Monitor International (BMI), Qatar is expected to spend US$80-100 billion over the next five years to prepare and deliver the infrastructure required to support the huge influx of visitors forecast to attend the 2022 FIFA World Cup.
  • Piling accurately with Trimble’s new tool
    June 10, 2019
    Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim