Skip to main content

High production at high altitude for Liebherr’s Compactmix 1.0

A Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete. The project was a challenge both in terms of logistics and on-site operation. The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps). From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger
May 20, 2019 Read time: 2 mins
High performance: Liebherr Compactmix 1.0 produces concrete at 2,340m for one of Europe’s largest aerial cableways
A 718 Liebherr Compactmix 1.0 is supplying the construction site for the V-cableway - or V-Bahn - project in the Swiss mountains with concrete.


The project was a challenge both in terms of logistics and on-site operation.

The Grindelwald-Männlichen Gondola Cableway company and Jungfraubahn railway company are planning to build a V-cableway that will open up both the Eiger Glacier and the Männlichen (Bernese Alps).

From a joint terminal in Grindelwald-Grund, a tri-cable aerial cableway will lead to the Eiger Glacier. There will also be a 10-seat aerial gondola cableway to Männlichen.

In addition, the new Rothenegg station will give the V-cableway a direct connection to public transport.

The project managers at ARGE V-Bahn Oberland were looking for a mixing plant that could be transported by cable car. They decided upon Liebherr’s Compactmix 1.0 for the major V-cableway project in Grindelwald. The Compactmix 1.0 A-R/ RIM-M has a compact design and can be pre-assembled into transport-friendly modules.

Since the aerial cableway was not ready for operation by the specified assembly date, the plant components were transported to the construction site by two axle-truck and dump truck. The plant was then built on the Eiger Glacier at an altitude of 2,340m.

For optimum mixing results, the plant is equipped with a ring-pan mixer with agitator system. For concrete production at low temperatures the plant is also fitted with winterproof housing. Concrete production is up to 60m³ per hour.

The aggregates and cement are also delivered to the plant by aerial cableway and fed directly from the cable car into the series silo. Total production volume is expected to be worth nearly €418 million. Opening is planned for the 2020/2021 winter season.

For more information on companies in this article

Related Content

  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams
  • A new Ammann asphalt plant in Australia
    April 10, 2023
    A new Ammann ABP 320 HRT plant is considered the most modern asphalt-mixing plant in Australia. This plant is helping the client to repurpose waste materials while lowering the carbon footprint of asphalt production.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.