Skip to main content

Extreme bridge deck

August saw the completion of the main bridge deck section on the mainland China side of the Hong King-Zhuha-Macau Bridge. The 55km-long link, comprising a series of tunnels and bridges crossing the Lingdingtang channel, will connect Zhuhai in Guangdong Province to Hong Kong and Macau.
December 15, 2017 Read time: 1 min
August saw the completion of the main bridge deck section on the mainland China side of the Hong King-Zhuha-Macau Bridge. The 55km-long link, comprising a series of tunnels and bridges crossing the Lingdingtang channel, will connect Zhuhai in Guangdong Province to Hong Kong and Macau.


763 Shell Bitumen, which has been providing technical support and consulting to the project since 2013, supplied the bitumen for the bridge deck. The deck has to survive extreme conditions including high temperatures, humidity, salt, heavy traffic loads and vibrations due to high winds in the Lingdingyang channel.

“The bridge deck project required solutions that would meet the stringent specifications we set to ensure high-quality performance as well as consistent quality and supply reliability.  We are very pleased with the quality of bitumen products and services provided by Shell,” said Zhang Yucai, chief engineer of the CB07 section of the Hong Kong-Zhuhai-Macau Bridge project.

For more information on companies in this article

Related Content

  • Innovative sealing of world's longest immersed tunnel
    April 16, 2012
    Infrastructure has been chosen to provide a sealing system for the world's longest immersed tunnel. China Communications Construction is said to have selected Trelleborg for the innovative design of its seals, which are claimed to ensure watertightness even through a seismic event. Part of China's prestigious Hong Kong - Zhuhai - Macau link project, the immersed near 6km tunnel will consist of 32 elements. The joints will be sealed with a Trelleborg sealing system including Gina gaskets, Omega seals and wat
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w