Skip to main content

Demolition success for MB crushers

Italian firm MB has supplied crushing and screening buckets for use in Brazil, with the units carrying out important demolition and sorting work for the 2014 World Cup. Through a partnership with Grupo Monte Sinai Locação, the MB units have used for the construction of the Arena Pernambuco stadium ahead of the 2014 Brazilian World Cup. The first BF90.3 was purchased by the firm in May 2011 and was used for recycling demolished material at the Atlantico Sul shipyard in the Port of Suape (Pernambuco).
November 29, 2012 Read time: 1 min
Italian firm 283 MB has supplied crushing and screening buckets for use in Brazil, with the units carrying out important demolition and sorting work for the 2014 1556 World Cup. Through a partnership with Grupo Monte Sinai Locação, the MB  units have used for the construction of the Arena Pernambuco stadium ahead of the 2014 Brazilian World Cup.
The first BF90.3 was purchased by the firm in May 2011 and was used for recycling demolished material at the Atlantico Sul shipyard in the Port of Suape (Pernambuco).

For more information on companies in this article

Related Content

  • Russia transport infrastructure cash for 2018 FIFA World Cup
    May 7, 2013
    New transport infrastructure in Russia will be created from a US$4.178 billion (RUB 130bn) federal budget pot for boosting transport, energy supply, communications, utilities, and safety infrastructure ahead of the country hosting the 2018 FIFA World Cup. Meanwhile, a further US$3.857 billion (RUB 120bn) is to be spent on the reconstruction of sport facilities ahead of the international football showpiece event. To pay for the huge infrastructure spending the Russian government is reported to have ordered
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed
  • Crushing and screening innovation for quarries
    November 5, 2012
    Novel crushing and screening developments are coming to market - Mike Woof reports A wide array of innovations and market developments are occurring in the sector for quarrying machinery. New technologies are being introduced while business developments are also changing the face of this market segment. There is strong interest in new technology from industry too and this was well highlighted by data from the organisers of the Hillhead quarry show in the UK. The organisers revealed that there was a jump of