Skip to main content

Demolition success for MB crushers

Italian firm MB has supplied crushing and screening buckets for use in Brazil, with the units carrying out important demolition and sorting work for the 2014 World Cup. Through a partnership with Grupo Monte Sinai Locação, the MB units have used for the construction of the Arena Pernambuco stadium ahead of the 2014 Brazilian World Cup. The first BF90.3 was purchased by the firm in May 2011 and was used for recycling demolished material at the Atlantico Sul shipyard in the Port of Suape (Pernambuco).
November 29, 2012 Read time: 1 min
Italian firm 283 MB has supplied crushing and screening buckets for use in Brazil, with the units carrying out important demolition and sorting work for the 2014 1556 World Cup. Through a partnership with Grupo Monte Sinai Locação, the MB  units have used for the construction of the Arena Pernambuco stadium ahead of the 2014 Brazilian World Cup.
The first BF90.3 was purchased by the firm in May 2011 and was used for recycling demolished material at the Atlantico Sul shipyard in the Port of Suape (Pernambuco).

For more information on companies in this article

Related Content

  • High mobility for Keestrack impact crusher
    January 16, 2017
    Keestrack is unveiling its latest R3 and R5 tracked impact crushers. The R3 weighs in at 33tonnes while the R5 is a 55tonne machine. Both share technical features and feature active pre-screening, while they are available with optional equipment that includes magnetic separators, fines conveyors and secondary screen modules with closed-circuit operation. The units have direct driven crushing units with large and heavy rotors, delivering high crushing energy combined with smooth running. Large inlet openings
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • JCB opens Brazilian factory
    December 3, 2012
    US$32.45 billion of infrastructure improvements are scheduled in Brazil and companies are looking to capitalise on this JCB’s new US$100 million factory in Brazil has been officially opened as the company strengthens its position in rapidly-expanding Latin American markets. At full capacity, the new plant will have the capability to produce 10,000 machines a year, and it replaces two smaller plants in Sorocaba, São Paulo State, the first of which JCB opened in 2001 to produce backhoe loaders, and the second
  • Effective, efficient long reach excavators
    April 13, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports The last 10-15 years have seen the way demolition work is carried out change dramatically. Safety issues have long been of concern in the demolition sector, with the industry having been criticised for not doing enough to protect its workforce. Demolition projects can be dangerous due to the very nature of the job, with old structures being knocked down and broken up on-site. There is a substantial risk to site workers from