Skip to main content

Concrete protection from chloride attack

Independent testing carried out at the VINCI Construction Technology Centre has now confirmed that Flexcrete’s Cementitious Coating 851 will provide an effective barrier to chlorides for at least 29 years. In 1988, a 2mm thick film of Cementitious Coating 851 was applied to a concrete slice and sealed in a chloride ion diffusion cell and it is still going strong some 29 years (10,586 days) later. Ongoing tests carried out in the VINCI Construction Technology Centre laboratory show that the barrier properti
July 3, 2018 Read time: 2 mins
Resistance to chloride attack is offered by Cementitious Coating 851
Independent testing carried out at the 3085 VINCI Construction Technology Centre has now confirmed that Flexcrete’s Cementitious Coating 851 will provide an effective barrier to chlorides for at least 29 years. In 1988, a 2mm thick film of Cementitious Coating 851 was applied to a concrete slice and sealed in a chloride ion diffusion cell and it is still going strong some 29 years (10,586 days) later. Ongoing tests carried out in the VINCI Construction Technology Centre laboratory show that the barrier properties of 851 have not changed after the test period spanning 29 years.


Manufactured by Flexcrete Technologies, part of the AkzoNobel group of companies, Cementitious Coating 851 is an advanced, two component, waterborne cementitious modified polymer coating. It is specified on both existing and new structures to waterproof concrete, reinstate concrete cover and provide a barrier to chloride ingress in sectors such as coastal highways. A 2mm coating of Cementitious Coating 851 is equivalent to 100mm of good quality concrete cover.

For more information on companies in this article

Related Content

  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Tunnel essential to reduce congestion
    February 21, 2012
    Vietnam's Ho Chi Minh City's dense population, which was estimated to be 10,680 persons/km2 in 2005, is, over the next ten years, set to benefit from the completion of the Thu Thiem Urban Area project, which will provide homes for up to 200,000 people.
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra