Skip to main content

Concrete additive boosts performance

The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles. According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, water proofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry po
September 27, 2017 Read time: 2 mins
The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles.


According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, waterproofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry powder form, while it can be utilised in pre-cast components as well as shotcrete.

Using it will prevent shrinkage cracks and deliver high resistance to freeze-thaw cycles, as well as making concrete 100% waterproof according to the producer. The product gives a high early strength of up to 60MPa (based on mix design) and is said to be both safe and non-toxic. It can be applied in temperature ranges from -22°C to 40°C and offers a high workability with low slump, while it can also be used for coating metal and concrete surfaces. The product also chemically inhibits the corrosive action of chlorides on reinforcing steel and pre-stressed strands in concrete according to the firm, while no curing is needed and it provides high resistance to chlorine, sea salt, acids and oils.

The product is versatile and can be used in a wide variety of applications including small forms and industrial precast forms, foundation pillars, monolithic slabs, roads, loading docks, yards, airport runways and highways.

Related Content

  • Speeding repairs of concrete motorway
    April 2, 2014
    A novel technique is now being introduced in the UK that can help cut construction costs, as well as the time needed for road repairs. Connect Plus, the company that finances, operates and upgrades the 400km M25 network on behalf of the UK’s Highways Agency, has pioneered an innovative method for the replacement of life-expired concrete motorway The introduction of this method is helping reduce the delays experienced by drivers by as much as 80% in the sections of road where it is now being implemented.
  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua
  • Reduced pollution with locally sourced materials
    February 24, 2012
    Robert Petts provides a practical example of gTKP at work. There is a substantial requirement for a range of sealers and binders in the global road infrastructure sector. The principal need is for the construction and maintenance of road surfaces and pavements. Globally, more than 100 million tonnes of bitumen are produced each year, mostly for use in the road sector.
  • Reduced pollution with locally sourced materials
    April 12, 2012
    Robert Petts provides a practical example of gTKP at work. There is a substantial requirement for a range of sealers and binders in the global road infrastructure sector. The principal need is for the construction and maintenance of road surfaces and pavements. Globally, more than 100 million tonnes of bitumen are produced each year, mostly for use in the road sector.