Skip to main content

Concrete additive boosts performance

The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles. According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, water proofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry po
September 27, 2017 Read time: 2 mins
The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles.


According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, waterproofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry powder form, while it can be utilised in pre-cast components as well as shotcrete.

Using it will prevent shrinkage cracks and deliver high resistance to freeze-thaw cycles, as well as making concrete 100% waterproof according to the producer. The product gives a high early strength of up to 60MPa (based on mix design) and is said to be both safe and non-toxic. It can be applied in temperature ranges from -22°C to 40°C and offers a high workability with low slump, while it can also be used for coating metal and concrete surfaces. The product also chemically inhibits the corrosive action of chlorides on reinforcing steel and pre-stressed strands in concrete according to the firm, while no curing is needed and it provides high resistance to chlorine, sea salt, acids and oils.

The product is versatile and can be used in a wide variety of applications including small forms and industrial precast forms, foundation pillars, monolithic slabs, roads, loading docks, yards, airport runways and highways.

Related Content

  • Major bridge construction on Denmark's road project
    April 20, 2012
    Doka is playing a leading role in Denmark’s first ever public private partnership roadbuilding project. The 26km long, four-lane M51, 15km from the German border, will link Kliplev and Sønderborg in southern Jutland. And Doka will be the sole provider offormwork for the concrete used in erecting the motorway’s 72 bridges and crossings. The M51 is using 9000m² of the extremely adaptable Large-area formwork Top 50, and more than 4,750 basic frames of the heavyduty Load-bearing tower Staxo 100 system.
  • Surface quality a key trend in asphalt paving
    March 7, 2012
    Improved surface quality and improved machine design are key trends in the asphalt paving sector, Mike Woof reports There is a big difference in asphalt paving techniques in North America and Europe. In North America, the need to construct long stretches of highway quickly resulted in wide pavers offering high throughput capacity, with compaction equipment then being used to achieve the required density of the various courses. In Europe's highway construction projects, distances tend to be shorter and contr
  • AMPle Protection from polycarbonate system
    June 15, 2012
    Taiwan-based Apus Molds and Plastics (AMP) says it has developed a ‘novel’ poly carbonate barrier system. Made from PC and PP materials, the barrier is said to be long lasting and corrosion resistant, as well as being lightweight and quick to install. Impact performance is also said to be good as the material helps absorb shock.
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between