Skip to main content

Cold comfort for Macismo and BituFIX in Mongolia

Macismo International reports that its newest cold asphalt licensee was used extensively in Mongolia last winter, proving its efficiency even at -20C.
November 29, 2019 Read time: 2 mins
BituFIX cold asphalt excels in -20C

Macismo International reports that its newest cold asphalt licensee was used extensively in Mongolia last winter, proving its efficiency even at -20C.

The Mongolian division of Bitumina – a global Dubai-based manufacturer of hi-end pavement binders – has a three-year contract to repair 280km of state-owned mining roads in Mongolia. The first stage of the project started last February during extremely adverse weather conditions.

Despite inclement weather, the performance of Bitumina’s BituFIX cold asphalt mix, was not affected.

“In Mongolia it’s still minus degree at night, but we made the first product of this year successfully and it’s performing pretty well.” said Ganshagai Battulga, chief executive of Bitumina Mongolia. “We started the project on February 13 and the condition was terrible when we first got there. It’s windy and snowing at -20C degrees but BituFIX did not fail us.”

Macisimo said that BituFIX’s performance during the winter attracted much attention at the three-day Mongolian Road Expo 2019 held in the capital Ulaanbaatar in October. During the Expo, Bitumina sealed deals on several substantial orders, said Battulga. “Our product-BituFIX became the hottest product during the Expo. It’s going famous among the people who work in this sector” says Battulga.

Macismo said it remains in discussion with Bitumina about Macisimo products to be used in the manufacture of bitumen emulsion.

Expo Mongolia usually highlights innovation and progress in the mining sector, mainly presenting mining technologies, equipment and devices. But this year it expanded its remit to cover water management issues regarding climate change, a major focus for many transportation authorities throughout the world.

Bituminia signed a five-year licence to sell their Bitufix cold asphalt mix. Only about 20% of the 50,000km of roads in Mongolia are asphalt paved roads. The remainder are dirt or gravel. In 2019, it the goal has been to have paved over 2,000km of roads completed to connect all province centres to Ulaanbaatar.

For more information on companies in this article

Related Content

  • Developments in concrete road construction
    February 7, 2012
    Innovative developments are pushing forward concrete road construction techniques. The concrete road sector looks to benefit from some key innovations and developments now coming to market or being employed in different territories. Irregular weather and environmental conditions can alter the rate at which concrete cures, with a risk of plastic shrinkage cracks that can compromise the integrity of a pavement. Contractors cannot control the environmental conditions of a paving project and when weather patter
  • AEM’s 2050 Vision winner combines road and rail
    March 9, 2017
    Five finalists for the Association of Equipment Manufacturer’s (AEM’s) Infrastructure Vision 2050 Challenge fought for the winning place in a live final, held at CONEXPO-CON/AGG’s Tech Experience zone. The finalists had to pitch their ideas to three judges in one of the white Tech Experience domes.
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e
  • The strangest things are found spread across motorways
    December 1, 2015
    It’s often a messy business cleaning up a motorway after a truck has shed its load, and the strangest of loads have been accidentally spread down the blacktop in the UK, according to Highways England. The most recent incident was a slippery affair for maintenance crews – 24tonnes of lard that took a day to clean up, closing the motorway for 24 hours. From toilet roll and toxic waste to wine and washing up liquid for dishes, clean-up crews sometimes must tread lightly as they go about their business. They