Skip to main content

CEMEX in the Sinai

CEMEX is supplying over 500,000m3 of concrete and approximately 760,000tonnes of cement for major infrastructure projects related to the main canal in Egypt, the Suez Canal. These projects involve the construction of tunnels to connect Egypt’s mainland to the Sinai Peninsula and the development of a commercial seaport. Through a joint venture with Orascom Construction and The Arab Contractors, CEMEX is supplying 350,000m3 of concrete and 160,000tonnes of cement for the construction of two tunnels that ext
October 4, 2018 Read time: 2 mins
Concrete and cement from CEMEX is helping construct new tunnels under the Suez Canal in Egypt
3016 CEMEX is supplying over 500,000m3 of concrete and approximately 760,000tonnes of cement for major infrastructure projects related to the main canal in Egypt, the Suez Canal. These projects involve the construction of tunnels to connect Egypt’s mainland to the Sinai Peninsula and the development of a commercial seaport.


Through a joint venture with 2414 Orascom Construction and 2512 The Arab Contractors, CEMEX is supplying 350,000m3  of concrete and 160,000tonnes of cement for the construction of two tunnels that extend from the outskirts of the city of Port Said in north-east Egypt to the Sinai Peninsula, passing under the Suez Canal. The construction of the twin 4km tunnels required the installation of three ready-mix batch plants on site to fulfil the project’s concrete demands.

This project forms part of the Egyptian government’s plan for the development of the Sinai Peninsula by improving accessibility. Historically, the only access to Sinai was through a single tunnel, slowing development possibilities and hindering transportation to and from Egypt’s mainland.

“As one of the main building materials suppliers, we take great pride in our participation in the development of these major infrastructure projects that will make a direct, positive impact on Egypt,” said Tarek Hammam, vice president of Ready Mix & Institutional Sales, CEMEX Egypt. “At CEMEX, our goal is to exceed our customers’ expectations by providing high-quality, resilient building materials together with a superior customer experience.”

Additionally, CEMEX is participating in the transformation of the Suez Canal area by supplying 132,000m3 of concrete and 600,000tonnes of cement for the development of the commercial East Port Said seaport, a 4.5km construction area.

For more information on companies in this article

Related Content

  • Kosovan highway ahead of schedule
    April 25, 2012
    In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border. Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousan
  • Indra chooses Citilog for Silvertown Tunnel
    June 28, 2024
    Citilog will integrate its automatic incident detection (AID) system to help reduce congestion in and around the tunnel between the London borough of Greenwich, the peninsula area, and West Silvertown.
  • Concrete plant for Mali contractor
    June 19, 2023
    A contractor in Mali has increased its concrete production capabilities with the addition of a third Eurotec ECO concrete batching plant. The new ECO90 joins the existing ECO30 and ECO50 machines already used by the firm, Z For Mining (ZFM).
  • Southeast Asia’s cutting-edge asphalt production
    April 1, 2014
    An eye-catching state-of-the-art asphalt plant is making a big impact in South East Asia, while other new and proven asphalt plant technology remains in demand in Europe and other continents. Guy Woodford reports Marini China has ventured out of its traditional Chinese market to deliver to a Singaporean customer what is claimed to be Asia’s largest asphalt plant. An impressive 45m tall and capable of producing 360tonnes/hour, the plant model was in response to Ley Choon Group’s request for a new plant ahead