Skip to main content

CEMEX concrete for bridge reconstruction in Arizona

CEMEX is supplying concrete for the Cameron Bridge, a job that forms part of the reconstruction of the Arizona section of Route 89 in the south-western US. Spanning nearly 200m, the new bridge includes four lanes for highway traffic, a pedestrian underpass, and other concrete flatwork that is expected to improve traffic flow and road safety.
February 9, 2018 Read time: 1 min
Concrete from CEMEX has been used for an Arizona bridge construction job
CEMEX is supplying concrete for the Cameron Bridge, a job that forms part of the reconstruction of the Arizona section of Route 89 in the south-western US.


Spanning nearly 200m, the new bridge includes four lanes for highway traffic, a pedestrian underpass, and other concrete flatwork that is expected to improve traffic flow and road safety.

To best meet the project’s construction demands, 3016 CEMEX installed a remote batch plant at a nearby quarry, which enabled the company to supply over 15,000m3 of concrete.

During this project’s development, CEMEX overcame several operational challenges, including pouring at a height of around 30m, dealing with winter weather shutdowns, as well as fluctuations in the level of the Little Colorado River Gorge.

For more information on companies in this article

Related Content

  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • New bridge in Colombia using materials from CEMEX
    March 7, 2018
    A new bridge project in Colombia is benefiting from the supply of concrete from CEMEX Latam Holdings The project is to build a new bridge for Colombia’s Río Magdalena 2 Highway, with the road being one of the primary infrastructure projects currently under development in the country. CEMEX Colombia is supplying concrete for several essential elements of the project, including a viaduct over the Magdalena River that will become one of the longest bridges in the country.
  • Poland’s major highway project is connecting the country
    October 18, 2017
    Concrete producer CEMEX is playing a key role in the construction of one of Poland’s main highway projects. The new S7 highway link will connect the Baltic coast to cities such as Warsaw, Kraków, and the Slovakian border region. In all over 400,000m3 of concrete is being supplied by CEMEX for the highway, with the material being used to build civil structures such as flyovers and bridges as well as drainage.
  • Panama highway rebuilt with concrete
    January 5, 2017
    A highway link to the north of Panama´s capital city that connects with a national park popular with tourists, has now been rebuilt Cement producer and concrete specialist CEMEX carried out a study into the project, to find a cost effective solution. And working with CEMEX, Panama’s Ministry of Public Works began planning for the project in 2015. A 5.7km stretch of the highway has now been improved, with the road structure being built from concrete.