Skip to main content

CDE Global improves its ProGrade screen design

Materials washing specialists CDE Global has announced the introduction of several screens in the ProGrade range which it says are lighter but stronger and so require less power to operate. The bolted screens also include no welds and are galvanised as standard, all of which serves to maximise plant life, maximise plant availability and minimise maintenance time. The patent pending CDE U-Span cross members are modular in design and have increased space between screen decks, allowing for quick and easy acces
March 10, 2015 Read time: 1 min
Materials washing specialists 3168 CDE Global has announced the introduction of several screens in the ProGrade range which it says are lighter but stronger and so require less power to operate.

The bolted screens also include no welds and are galvanised as standard, all of which serves to maximise plant life, maximise plant availability and minimise maintenance time.

The patent pending CDE U-Span cross members are modular in design and have increased space between screen decks, allowing for quick and easy access to replace screen media.

The new screen design system is now available on the 2-deck ProGrade P2-75 and P2-108, as well as the 3-deck P3-75 and, in several months, the P3-108.

For more information on companies in this article

Related Content

  • JCB introduces loader with increased productivity
    October 2, 2014
    JCB’s top-of-the-range 457 wheeled loader now benefits from the firm’s new CommandPlus cab. The machine also features a sloping engine cover and rear counterweight design, which helps improve visibility, as well as having lower noise levels and more cab space for the operator. Power for the 457 loader now comes from a Tier 4 Final/Stage IV compliant MTU diesel, which is said to offer a 16% fuel saving over the engine being replaced. As with other JCB machines, the engine in the 457 meets Tier 4 Final wit
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Deciding whether to buy new or used equipment
    May 20, 2015
    Customers can face the choice of buying used or new equipment – Dan Gilkes writes. The decision to buy either new or used equipment is almost as old as the construction plant market itself. However some of the reasons for choosing between the two might well be changing, to meet new demands from customers across the world and to cope with a changing supply base. Ever more stringent emissions legislation in Europe, the US and Japan, rapidly developing emerging markets that want the productivity of the latest
  • Keestrack’s hybrid mobile cone crusher H4e electrifies Hillhead
    November 7, 2018
    At this year’s recent Hillhead equipment exhibition, Keestrack introduced into the UK its fully hybrid mobile cone crusher H4e Keestrack says that the highly compact plant with optional integrated pre-screen and three-deck hanging screen offers energy savings in productive secondary or tertiary crushing. Keestrack’s range for quarrying and recycling applications includes more than 20 models, offering production rates from 200-1,200tonnes/hour. Almost all models are available in diesel-electric or full-el