Skip to main content

Carmix offers concrete pumping efficiency

Italian firm Metalgalante claimed that its latest Carmix TrailerPump 15 concrete pumps can deliver concrete higher and further than previous models. The new TrailerPump is compact in size, measuring just over 4m long by 1.5m wide and 1.5m high. This makes it easy to manoeuvre onsite and allows it to be used in applications where access may be limited. The unit has a powerful twin-cylinder piston pump with a hydraulic control, which is said to ensure a capacity of up to 15m3/hour at a pressure of 70 bars
August 24, 2016 Read time: 2 mins
The new Carmix trailer mounted concrete pump is said to be powerful, compact and versatile
Italian firm Metalgalante claimed that its latest 8074 Carmix TrailerPump 15 concrete pumps can deliver concrete higher and further than previous models.

The new TrailerPump is compact in size, measuring just over 4m long by 1.5m wide and 1.5m high. This makes it easy to manoeuvre onsite and allows it to be used in applications where access may be limited. The unit has a powerful twin-cylinder piston pump with a hydraulic control, which is said to ensure a capacity of up to 15m3/hour at a pressure of 70 bars. The 240litre hopper, effective agitator, 12V electro-vibrator and its EasySpritz system are said to combine to optimise pumping performance.

The pump can be controlled through a remote unit with four functions. The machine also has the firm’s novel Concrete-Mate weighing system, which is said to provide high accuracy for concrete preparation. It also benefits from the firm’s sophisticated Promix package, a digital device that optimises mix design due to a sensor installed in the barrel. The sensor transmits information on the slump, temperature, humidity and speed of rotation of the cement mixer to the cab, but also indicates when the mix is ready.

For more information on companies in this article

Related Content

  • Smarter paving for Berlin ring road
    December 13, 2018
    Germany’s capital Berlin is now benefiting from a newly widened ring road, which will help reduce peak time congestion Much of the work has been carried out by local contractor Johann Bunte Bauunternehmung, which has helped to widen the Berlin ring road from six to eight lanes. The firm has made extensive use of sophisticated paving controls also on its Vögele machines, the AutoSet Plus automatic functions. And the firm claims that these tools have made the work easier for the paving team to move between t
  • Versatile wheeled excavator from Komatsu
    January 11, 2019
    Komatsu Europe is now offering the versatile and compact PW118MR‐11 wheeled excavator. This midi excavator has a short tailswing and is powered by a low emission Stage IV engine, offering a 6% fuel saving over earlier models. The machine is said to be rugged and stable, with a class‐leading performance for its compact size. The machine is said to combine power, precise control and compact dimensions, suiting it to use for excavating tasks in narrow alleys or on road‐construction sites for example. The firm
  • Monitoring software update from Trimble
    November 15, 2019
    Trimble is offering an updated version of its real-time monitoring software, the 4D Control package. This Version 5.0 upgrade offers new features that allow users to streamline real-time structural monitoring system deployment as well as simplify the connection to geotechnical sensors. Trimble 4D Control software allows project stakeholders to monitor critical infrastructure such as dams and bridges along with buildings surrounding construction sites and tunnels.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b