Skip to main content

Carmix offers concrete pumping efficiency

Italian firm Metalgalante claimed that its latest Carmix TrailerPump 15 concrete pumps can deliver concrete higher and further than previous models. The new TrailerPump is compact in size, measuring just over 4m long by 1.5m wide and 1.5m high. This makes it easy to manoeuvre onsite and allows it to be used in applications where access may be limited. The unit has a powerful twin-cylinder piston pump with a hydraulic control, which is said to ensure a capacity of up to 15m3/hour at a pressure of 70 bars
August 24, 2016 Read time: 2 mins
The new Carmix trailer mounted concrete pump is said to be powerful, compact and versatile
Italian firm Metalgalante claimed that its latest 8074 Carmix TrailerPump 15 concrete pumps can deliver concrete higher and further than previous models.

The new TrailerPump is compact in size, measuring just over 4m long by 1.5m wide and 1.5m high. This makes it easy to manoeuvre onsite and allows it to be used in applications where access may be limited. The unit has a powerful twin-cylinder piston pump with a hydraulic control, which is said to ensure a capacity of up to 15m3/hour at a pressure of 70 bars. The 240litre hopper, effective agitator, 12V electro-vibrator and its EasySpritz system are said to combine to optimise pumping performance.

The pump can be controlled through a remote unit with four functions. The machine also has the firm’s novel Concrete-Mate weighing system, which is said to provide high accuracy for concrete preparation. It also benefits from the firm’s sophisticated Promix package, a digital device that optimises mix design due to a sensor installed in the barrel. The sensor transmits information on the slump, temperature, humidity and speed of rotation of the cement mixer to the cab, but also indicates when the mix is ready.

For more information on companies in this article

Related Content

  • Rural Czech roads get paving upgrade
    November 2, 2012
    A series of rural road rebuilds have improved transport connections in the Czech Republic, helping to boost connectivity and the local economy The roads around Brandýs nad Labem, some 25km to the southwest of Czech capital Prague are crucial arteries to the rural and agricultural areas of the country. An assessment by regional authorities indicated that these roads are in need of repair. That led to cold planing and paving work on a series of rural roads near Brandýs nad Labem. The regional authorities had
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.

  • Benninghoven’s modern masterpiece
    April 4, 2013
    In 2012 Benninghoven were commissioned by Kostmann, an Austria-based consortium of companies involved in the production and refinement of raw materials, to build an asphalt mixing plant that included a stone tower silo system. The plant - TBA-3000-U –was to be sited at Weitendorf, a location offering good access to the motorway, the Styria regional capital, Graz, and the Austria-Slovenia border. However, the close proximity of agricultural land and private residential areas called for an adherence to strict
  • Runway rebuild for key Bulgarian airport
    August 21, 2013
    Varna Airport in north-east Bulgaria provides an important international link for the country, with a runway rebuild helping improve capacity. The airport is of particular importance for Bulgaria’s tourist trade as it provides a major connection for visitors to the Black Sea coast. And the reconstruction work at Varna Airport’s only runway will ensure the facility is able to handle the area’s increasing visitor numbers. The project had to be carried out quickly and efficiently to prevent delays to f