Skip to main content

Calor’s LNG supplies the UK’s first asphalt plant for Aggregates Industries

Aggregate Industries’ Colemans Quarry site has become the first asphalt plant in the UK to make the switch to LNG, cutting both costs and carbon emissions with the help of Calor. The site is also only the second in the world, according to Calor, and the gas provider’s first turnkey LNG installation in the UK. Colemans Quarry, based in Somerset, south-west England, has been supplying the construction industry with building material for more than 60 years. It operates 24/7 and uses large quantities of g
January 4, 2016 Read time: 2 mins
A new asphalt plant for Aggregate Industries is now fuelled by LNG
2297 Aggregate Industries’ Colemans Quarry site has become the first asphalt plant in the UK to make the switch to LNG, cutting both costs and carbon emissions with the help of 8291 Calor.

The site is also only the second in the world, according to Calor, and the gas provider’s first turnkey LNG installation in the UK.

Colemans Quarry, based in Somerset, south-west England, has been supplying the construction industry with building material for more than 60 years. It operates 24/7 and uses large quantities of gas to heat and dry the 250,000tonnes of asphalt produced each year.

The site is located off the main gas grid, and until recently the plant’s burners were fuelled with kerosene. After seeing an opportunity to reduce both emissions and fuel bills, Aggregate Industries approached Calor about working together on a new heating solution.

“We were previously using kerosene, but LNG is a more cost-effective product to burn,” said plant manager Simon Evans. It also produces a lot less carbon.

As well as substantially cutting fuel costs, the project has reduced the amount of CO2 emitted per tonne of asphalt produced at the site by 17%. This cuts Aggregate Industries’ annual emissions by 1,800tonnes.

For more information on companies in this article

Related Content

  • Take control in asphalt plants
    September 24, 2018
    Control systems play a crucial role in effective and efficient asphalt production. Production manager Richard Stott works for Aggregate Industries and focuses on ensuring that output is maximised. At the same time, Stott also follows the company policy on utilising the most sustainable technology and processes available Delivering on both fronts is no small task, but the firm has achieved that at its facility in Sheffield in the UK. RAP utilisation is high and meets the company’s sustainability goals. Pr
  • A breakthrough in the horizontal reuse of PA (porous asphalt)
    May 12, 2016
    An ambitious objective has led to significant steps in the reuse of PA (porous asphalt). While the market incidentally produces PA with a maximum of 30% of recovered raw materials, BAM has introduced its own innovations, enabling more than 90% of raw materials to be reused. And this year, subsidies from the European Commission will enable the LE2AP demonstration project to be constructed: one kilometre of sustainable PA. Large-scale production is also being developed.
  • Reducing asphalt plant downtime
    December 12, 2018
    How asphalt plant control add-ons make operation easier while reducing costly downtime - *Carlos Cardenas The word downtime might as well be a curse word in the asphalt production industry. As any operator will say, unplanned plant shutdowns can end up costing a producer heavily in lost production, not to mention a line of unhappy truck drivers and asphalt customers. The key is to get ahead of the problem and spot issues before they skyrocket in severity. Fortunately, some asphalt plant manufacturers offe
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.