Skip to main content

Calor’s LNG supplies the UK’s first asphalt plant for Aggregates Industries

Aggregate Industries’ Colemans Quarry site has become the first asphalt plant in the UK to make the switch to LNG, cutting both costs and carbon emissions with the help of Calor. The site is also only the second in the world, according to Calor, and the gas provider’s first turnkey LNG installation in the UK. Colemans Quarry, based in Somerset, south-west England, has been supplying the construction industry with building material for more than 60 years. It operates 24/7 and uses large quantities of g
January 4, 2016 Read time: 2 mins
A new asphalt plant for Aggregate Industries is now fuelled by LNG
2297 Aggregate Industries’ Colemans Quarry site has become the first asphalt plant in the UK to make the switch to LNG, cutting both costs and carbon emissions with the help of 8291 Calor.

The site is also only the second in the world, according to Calor, and the gas provider’s first turnkey LNG installation in the UK.

Colemans Quarry, based in Somerset, south-west England, has been supplying the construction industry with building material for more than 60 years. It operates 24/7 and uses large quantities of gas to heat and dry the 250,000tonnes of asphalt produced each year.

The site is located off the main gas grid, and until recently the plant’s burners were fuelled with kerosene. After seeing an opportunity to reduce both emissions and fuel bills, Aggregate Industries approached Calor about working together on a new heating solution.

“We were previously using kerosene, but LNG is a more cost-effective product to burn,” said plant manager Simon Evans. It also produces a lot less carbon.

As well as substantially cutting fuel costs, the project has reduced the amount of CO2 emitted per tonne of asphalt produced at the site by 17%. This cuts Aggregate Industries’ annual emissions by 1,800tonnes.

For more information on companies in this article

Related Content

  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • The dark arts of asphalt production
    January 5, 2017
    Asphalt production is a complex process featuring many variables - Mike Varner, chief engineer at Astec Inc discussed methods with Mike Woof Asphalt production in a black art in more ways than one. It involves a complex process of mixing bitumen with aggregates under temperature and optimising this operation is crucial to maximise quality. But with so many variables, determining exactly what is going on inside an asphalt plant involves extensive research, sophisticated computer modelling and the use of a
  • Glass ceiling breakthrough for Ammann in Australia
    November 18, 2019
    An Ammann ABP High Recycling Technology (HRT) asphalt mixing plant is a key part of an Australian recycled glass-for-asphalt scheme.
  • Clean road construction technology is coming from Wirtgen
    May 14, 2025

    Dr Volker Knickel, CEO of the Wirtgen Group said that the firm is working to deliver sustainable and efficient road construction technologies. Warm asphalt plays a key role in sustainable road construction and will grow in use in the next few years. Dr Knickel commented that sustainability will be of increasing importance for contractors, while in Germany there are also stricter regulations on reducing the exposure site personnel to VOCs.