Skip to main content

Breaking up material, in Qatar

January 7, 2019 Read time: 2 mins
MB Crusher equipment is being used to help build facilities for the 2022 World Cup in Qatar

Screening attachments from 283 MB Crusher are carrying out useful work in Qatar on the construction project to build the new 2022 World Cup stadia.

The firm says that this will be the third time the World Cup has seen the use of mobile crushing or screening attachments from MB Crusher being used, with similar units having been employed for the 2014 event in Brazil and the 2010 event in South Africa.

The local construction company involved in these projects, Al-Jaber and Makhlouf Company, is using an MB-S18 screening bucket for the works of Al Furousiya Street, in the Aspire Zone.

With just one piece of equipment connected to a 233 Hitachi excavator, the company has been able to complete work at a site that would have required much more time, more resources and cost more. The excavated material was screened by the MB-S18. The coarser part was used as a sub-base, while the fine part was mixed with sand and used as base.

Because the large processing plants are about 50km from the site, the use of the MB screener reduced truck journeys on a road that already has a high traffic load. And by processing and reusing the excavated material directly on site, processing times and procurement costs have been halved.

The MB equipment will also be used on further projects in Qatar, including building new transport infrastructure. Jobs still planned in the country include the construction of a 320km new metro network, and the connection of all the stadia with the country's motorway system.

For more information on companies in this article

Related Content

  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams
  • Get paid faster for your work by being efficient, optimised, and careful with resources… get connected now
    September 1, 2023
    In this, the third roundtable meeting in World Highways’ series of Connected Construction discussions, Guy Woodford discusses the implications of developments in artificial intelligence (AI) and machine control with world-class experts in their field. Find out what Elwyn McLachlan, vice president of Civil Solutions at Trimble, Murray Lodge, senior vice president and general manager of Construction at Topcon Positioning Group, and Magnus Thibblin, vice president Heavy Construction at Hexagon Geosystems have to say about how you should be positioning your company for a successful future.
  • Global growth in machine rental
    May 20, 2015
    The machine rental sector is undergoing significant expansion worldwide – Dan Gilkes reports. Plant hire, equipment rental, leasing, call it what you will, being able to use a machine when and where you need it, with no further concerns relating to ownership costs, depreciation or sudden repair bills, remains a compelling argument for many contractors. Which is one of the main reasons for the continued growth in popularity of equipment rental across the world. Rental has been big business in the UK, the US
  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated