Skip to main content

Breaking up material, in Qatar

January 7, 2019 Read time: 2 mins
MB Crusher equipment is being used to help build facilities for the 2022 World Cup in Qatar

Screening attachments from 283 MB Crusher are carrying out useful work in Qatar on the construction project to build the new 2022 World Cup stadia.

The firm says that this will be the third time the World Cup has seen the use of mobile crushing or screening attachments from MB Crusher being used, with similar units having been employed for the 2014 event in Brazil and the 2010 event in South Africa.

The local construction company involved in these projects, Al-Jaber and Makhlouf Company, is using an MB-S18 screening bucket for the works of Al Furousiya Street, in the Aspire Zone.

With just one piece of equipment connected to a 233 Hitachi excavator, the company has been able to complete work at a site that would have required much more time, more resources and cost more. The excavated material was screened by the MB-S18. The coarser part was used as a sub-base, while the fine part was mixed with sand and used as base.

Because the large processing plants are about 50km from the site, the use of the MB screener reduced truck journeys on a road that already has a high traffic load. And by processing and reusing the excavated material directly on site, processing times and procurement costs have been halved.

The MB equipment will also be used on further projects in Qatar, including building new transport infrastructure. Jobs still planned in the country include the construction of a 320km new metro network, and the connection of all the stadia with the country's motorway system.

For more information on companies in this article

Related Content

  • Football success for MB in Brazil
    December 3, 2012
    Italian Company MB has seen its products used at various sites in Brazil in preparation for the 2014 Football World Cup. Following a partnership with Grupo Monte Sinai Locação, MB's crusher and screening buckets have been used during construction of the Arena Pernambuco stadium in the city of Recife, eastern Brazil, which is being carried out by Construtora Norberto Odebrecht. It was Odebrecht who contacted Grupo Monte Sinai for the hire of its MB crusher buckets. Following initial contact between Grupo Mon
  • Crushing and screening help building Qatar’s new routes
    June 7, 2016
    Al-Mohsen Engineering in Qatar is one of the country’s leading specialists for the supply of aggregates to major construction companies. The firm is currently producing materials for many of Qatar’s infrastructure projects. Al-Mohsen is now a major player in the construction segment thanks to its ability to supply large volumes of high-quality aggregates to the market. The firm has invested in a range of Powerscreen rock crushing and screening equipment to meet the aggressive aggregates demands of huge loca
  • Qatar quarry boosts output with SDLG wheeled loaders
    February 8, 2018
    A fleet of SDLG wheeled loaders is helping to optimise production at a quarry in Qatar. The three SDLG wheeled loaders are operating long hours and are being used to feed crushing and screening equipment at the site in Qatar. The three SDLG LG958L wheeled loaders have managed to clock 2,000 operating hours in four months at the quarry. The site is owned by Doha-based contracting company Al Maram International, which uses crushing and screening equipment to reduce and sort limestone, primarily for asphalt
  • Crushing basalt with MB Crusher
    October 4, 2018

    Equipment from Italian firm MB Crusher is playing an important role in the crushing sector in Djibouti