Skip to main content

Breaking up material, in Qatar

January 7, 2019 Read time: 2 mins
MB Crusher equipment is being used to help build facilities for the 2022 World Cup in Qatar

Screening attachments from 283 MB Crusher are carrying out useful work in Qatar on the construction project to build the new 2022 World Cup stadia.

The firm says that this will be the third time the World Cup has seen the use of mobile crushing or screening attachments from MB Crusher being used, with similar units having been employed for the 2014 event in Brazil and the 2010 event in South Africa.

The local construction company involved in these projects, Al-Jaber and Makhlouf Company, is using an MB-S18 screening bucket for the works of Al Furousiya Street, in the Aspire Zone.

With just one piece of equipment connected to a 233 Hitachi excavator, the company has been able to complete work at a site that would have required much more time, more resources and cost more. The excavated material was screened by the MB-S18. The coarser part was used as a sub-base, while the fine part was mixed with sand and used as base.

Because the large processing plants are about 50km from the site, the use of the MB screener reduced truck journeys on a road that already has a high traffic load. And by processing and reusing the excavated material directly on site, processing times and procurement costs have been halved.

The MB equipment will also be used on further projects in Qatar, including building new transport infrastructure. Jobs still planned in the country include the construction of a 320km new metro network, and the connection of all the stadia with the country's motorway system.

For more information on companies in this article

Related Content

  • Aggregate machinery makers raise the efficiency bar
    May 22, 2018
    Manufacturers of crushers and screens are making their equipment more efficient as well as quieter. Among new entrants into the jaw crusher market is the MC 120 Pro, from Writgen company Kleemann. It was launched last September at the industry trade fair in Homberg/Nieder-Ofleiden, Germany. Both the diesel-electric jaw crusher – operating as part of an interlinked machine combination additionally comprising the MCO 11 PRO cone crusher and MS 953 EVO screening plant – and the MBRG 2000 granulator showed off
  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • Versatile crushing and screening equipment
    February 13, 2012
    Work on a key link in the United Arab Emirates is benefiting from the use of equipment supplied by Sandvik Mining and Construction. The firm supplied key equipment for the Salalah bypass project, a 32km road link that will span the entire length of Salalah City as it runs from Raysut in the east, towards Ayn Razat in the west.
  • RAP extends road maintenance and construction budgets
    October 26, 2020
    As fuel tax revenue disappears in the pandemic, the city of Janesville, Wisconsin is seeing savings and performance benefits