Skip to main content

Boosting quarry efficiency by cutting fines

The Norwegian quarry firm Feiring Bruk reports an 88% reduction in fines following the commissioning of its new wet processing plant. The firm operates primarily in eastern Norway and has 10 sites extracting and producing crushed stone, gravel and asphalt.
June 4, 2020 Read time: 2 mins
Using a new wash plant is helping boost efficiency for a Norwegian quarry firm

As well as its multiple sites in the east of the country, Feiring Bruk works across Norway for key clients, using mobile crushing and screening plants. Having amassed fines stockpiles at Lørenskog quarry alone, Feiring Bruk was keen to identify a solution that would allow the material to be processed and valuable product recovered.

Modularity and mobility are at the core of equipment designed by CDE and this was an important factor for Feiring Bruk as its operations rely on portability. The firm said that it had a massive amount of material it had been unable to exploit, and which previously would have been deposited. But with the new facility it can now extract washed out particles of zero size and can recover a range of new products the previous system was unable to process.

The washing plant at Feiring Bruk’s Lørenskog quarry comprises an M2500 E5X mobile washing plant with integrated hopper, feed conveyor and P3-75 Infinity Screen and EvoWash sand washing plant. For water processing there is an AquaCycle thickener with automatic dosing station, AquaStore water storage tank and a secure control station. Laboratory tests by Feiring Bruk show that the system washes out 88% of the fines. Before washing, the material contains 65kg of fines per tonne, whereas the washed product has just 8kg of fines/tonne. In fraction 0–20, they have measured 6.5% fines before washing. After washing, the fines content is reduced to 0.75%.

Using its new washing plant, Feiring Bruk is able to make use of a large proportion of the excess product. The wash plant systems are designed to recirculate up to 90% of water, helping to reduce the volume of fresh top-up water required. In addition, the Feiring Bruk plant has been placed on a sloped asphalt surface which allows water to flow into the water basin used as a reservoir.

Products extracted using the new washing plant are attracting the attention of new customers in Norway for their improved grading accuracy. The firm says that its customers want drainage gravel in fraction 8–16 to avoid fines. Now the company can supply drainage gravel in fraction 4–16 that has been washed and is free of fines. The uses for the washed material include asphalt and concrete production and paving stones.

Related Content

  • Asphalt plant innovators offer RAP rates of more than 60%
    May 27, 2020
    Ammann, Astec and Fayat are all introducing innovative new technology for the asphalt plant sector that offer solutions for the use of RAP as well as effective maintenance.
  • Sandvik Mobile Crushers and Screens unveil two new models
    January 6, 2017
    Sandvik Construction Mobile Crushers and Screens is officially launching two new additions to its product offering, a new heavy-duty scalper and a new Impactor model. The latest incarnation of the original E7 mobile scalper is said to demonstrate the value of customer feedback and experience, as the new model contains a “wish list of features and benefits that far exceed traditional expectations of durability and technical excellence.” Customer requirements, said to have been met with the new model, include
  • Flexibility with Mobiscreen MSS 802(i) EVO
    August 8, 2022
    Kleeman says that its new Mobiscreen MSS 802(i) EVO offers users a mobile, efficient screening plant to meet changing challenges in different applications. It demonstrates how a high material flow can be guaranteed in natural stone and recycling applications.
  • Mobile plant provides asphalt answer at airport
    September 30, 2013
    The project to upgrade Kassel-Calden Airport in Germany is providing a much improved facility. Opened in 1970, the original airport had a short runway that was not suited to predicted traffic volumes and current standards so a complete reconstruction of the facility has been carried out. The €271 million investment in the facility is expected by the developers to provide a strong economic benefit to the area. The original airport was built on an area of over 200ha and a new and longer runway has been con