Skip to main content

Big screen impact

Nymølle Stenindustrier, a Denmark based gravel supplier, has replaced some of its screening media with Sandvik’s new WR Modular Screening Media. The modular construction of the new system meant that neither the frame, nor the screen, needed to be rebuilt, with a bonus being that the new screen is said to provide around 15% greater production capacity, with enhanced material separation, making the replacement a highly cost-effective investment.
September 19, 2012 Read time: 2 mins
The material in the lower hand has been screened with the previous screening media, while the uppermost material has been screened using the Sandvik WR modular system
6583 Nymølle Stenindustrier, a Denmark based gravel supplier, has replaced some of its screening media with 325 Sandvik’s new WR Modular Screening Media.

The modular construction of the new system meant that neither the frame, nor the screen, needed to be rebuilt, with a bonus being that the new screen is said to provide around 15% greater production capacity, with enhanced material separation, making the replacement a highly cost-effective investment.

With around 25% of the Danish market, Nymølle Stenindustrier is one of Denmark’s largest suppliers of gravel.

Operating since 1909, the company now has 30 facilities in Fyn, Jutland and Själland, with a combined annual production of 7-8million tonnes of sand and aggregate. The produced materials are used for concrete structures, asphalt, road building, drains and other associated purposes.

Through its own laboratory, the company is able to analyse and check the materials produced, thus ensuring that customers receive high quality end products.

Nymølle Stenindustrier’s facility in Røde Kro near Aabenrå in Jutland produces around 250,000tonnes of material each year, of which 110,000tonnes are washed sand, with the remainder being aggregate.

During the summer of 2011, the facility identified a requirement to replace the screening media in one of the primary screens – a Svedala VFS 48/21 - which also operates as a washing screen. For a replacement the site’s production manager, Jens Rasmussen, contacted Sandvik Construction.

For more information on companies in this article

Related Content

  • Sandvik Mobile Crushers and Screens unveil two new models
    February 13, 2013
    Sandvik Construction Mobile Crushers and Screens is officially launching two new additions to its product offering, a new heavy-duty scalper and a new Impactor model. The latest incarnation of the original E7 mobile scalper is said to demonstrate the value of customer feedback and experience, as the new model contains a “wish list of features and benefits that far exceed traditional expectations of durability and technical excellence.” Customer requirements, said to have been met with the new model, include
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac
  • Sandvik’s Chinese renewal with new distribution
    November 21, 2018
    Sandvik Mobile Crushers & Screens now has a strong presence in China through its new mainland China distributor, Pota Environment (Shanghai). The firm’s novel QI441 Prisec impactor is said to offer unparalleled control, flexibility and productivity as a primary or secondary crusher for recycling and quarrying customers. The machine benefits from the patented Prisec crushing chamber, which has been designed by Sandvik to enable the base crusher to be easily switched between primary and secondary mode. This
  • Better road surfaces to last longer
    August 23, 2013
    Preservation can make roads perform better and last longer - and save money in the long run. Kristina Smith reports BAM Wegen has laid the first ever half-warm porous asphalt section on a major highway in the Netherlands. The asphalt for the 500m-long test section on the A18 near Varsseveld was produced at 105°C rather than 160°C, representing a saving on energy and CO2 emissions of around 30%.