Skip to main content

Big screen impact

Nymølle Stenindustrier, a Denmark based gravel supplier, has replaced some of its screening media with Sandvik’s new WR Modular Screening Media. The modular construction of the new system meant that neither the frame, nor the screen, needed to be rebuilt, with a bonus being that the new screen is said to provide around 15% greater production capacity, with enhanced material separation, making the replacement a highly cost-effective investment.
September 19, 2012 Read time: 2 mins
The material in the lower hand has been screened with the previous screening media, while the uppermost material has been screened using the Sandvik WR modular system
6583 Nymølle Stenindustrier, a Denmark based gravel supplier, has replaced some of its screening media with 325 Sandvik’s new WR Modular Screening Media.

The modular construction of the new system meant that neither the frame, nor the screen, needed to be rebuilt, with a bonus being that the new screen is said to provide around 15% greater production capacity, with enhanced material separation, making the replacement a highly cost-effective investment.

With around 25% of the Danish market, Nymølle Stenindustrier is one of Denmark’s largest suppliers of gravel.

Operating since 1909, the company now has 30 facilities in Fyn, Jutland and Själland, with a combined annual production of 7-8million tonnes of sand and aggregate. The produced materials are used for concrete structures, asphalt, road building, drains and other associated purposes.

Through its own laboratory, the company is able to analyse and check the materials produced, thus ensuring that customers receive high quality end products.

Nymølle Stenindustrier’s facility in Røde Kro near Aabenrå in Jutland produces around 250,000tonnes of material each year, of which 110,000tonnes are washed sand, with the remainder being aggregate.

During the summer of 2011, the facility identified a requirement to replace the screening media in one of the primary screens – a Svedala VFS 48/21 - which also operates as a washing screen. For a replacement the site’s production manager, Jens Rasmussen, contacted Sandvik Construction.

For more information on companies in this article

Related Content

  • Quarry's first New Holland loader
    February 6, 2012
    Privately-owned contractor Pat Munro's first New Holland wheeled loader, an 18tonne W190B, is being used at the company's Caplich quarry in Alness, north of Inverness, Scotland. It plays an essential role in the production process at the site, which produces around 150,000tonnes of material/year. The quarry is a sand and gravel operation and also produces readymix concrete and asphalt as well as sorting and storing recycled materials from local construction projects.
  • Brazil’s booming economy fuels infrastructure demand
    July 18, 2012
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves stil
  • Brazil’s booming economy fuels infrastructure demand
    July 18, 2012
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves stil
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen