Skip to main content

Beton bets on Amman’s CBS 120 SL Elba Concrete Mixing Plant

Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg. Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to cu
May 15, 2019 Read time: 3 mins
Ammann’s CBS 120 SL Elba Concrete Mixing Plant with swivelling hopper and additive storage containers
Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg.  


Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new 6791 Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to customers and construction sites to hone a competitive edge in the concrete market.

Being closer to customers also ensures shorter transportation distances to satisfy environmental concerns. To this end, Thomas Beton now produces concrete at 26 facilities across the German states of Schleswig-Holstein, Hamburg, Bremen and Lower Saxony.

The Ammann CBS 120 SL Elba Concrete-Mixing Plant features a frequency-controlled skip hoist. It offers theoretical output of up to 121m³/hour yet has minimal space requirements. Most of the components are galvanised to ensure maximum protection against corrosion.

Beton opted for the Ammann CEM 2660S Elba Single-Shaft Compulsory Mixer with its double helix. High mixing intensity and fast homogenisation are the hallmarks of the mixer.

“Simple operation and good access for maintenance were key factors in our decision to purchase this plant,” said Rainer Brings, chief executive of Beton.

Due to on-site conditions at Elmshorn, the Ammann CEL 210/6 Elba Linear Storage Bin was lowered by 3m to allow grade-level filling. This eliminated the need for an approach ramp, and additives such as steel fibres are now discharged directly onto the weighing belt at grade level. The opposite filling opening was increased to optimise filling and utilisation of the chamber volume. The segment dosing seals are operated pneumatically and their opening width can be adjusted freely.

“We are also able to handle the production of special concrete varieties and other difficult assignments with the accustomed quality,” said Brings.

Plant specifications were defined quickly and construction started promptly.

In its basic version, the Ammann CBS Elba plant is installed on concrete foundations, but mounting on a steel frame without foundations is equally possible. Chamber walls and partitions are keyed for assembly of the linear batcher. Pre-installation of components such as the skip hoist track and the segment dosing seals saves time on-site.

At winter temperatures, smooth mixing is ensured by the insulated housing together with a hot air/hot water system to heat the aggregates in the linear batcher and the feed water needed for the concrete.

For more information on companies in this article

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Italian expertise in concrete production
    March 3, 2015
    Italian firm Marcantonini has had significant results in delivering concrete batching equipment and concrete distribution technology to the concrete production segment in Romania. These fully insulated plants have met tough requirements with regard to output as well as sustainability. The firm says that its plants are designed to high standards to ensure the production of high quality concrete while optimising efficiency. The plants are said to offer functionality, practicality, ease of maintenance and low
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Upgrades to existing plants with retrofits
    June 24, 2021
    Existing mix plants can be upgraded significantly by retrofitting, as has been seen by a plant upgrade for a client in Mintraching, close to Regensburg in Bavaria