Beton bets on Amman’s CBS 120 SL Elba Concrete Mixing Plant

Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg. Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to cu
May 15, 2019 Read time: 3 mins
Ammann’s CBS 120 SL Elba Concrete Mixing Plant with swivelling hopper and additive storage containers
Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg.  


Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new 6791 Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to customers and construction sites to hone a competitive edge in the concrete market.

Being closer to customers also ensures shorter transportation distances to satisfy environmental concerns. To this end, Thomas Beton now produces concrete at 26 facilities across the German states of Schleswig-Holstein, Hamburg, Bremen and Lower Saxony.

The Ammann CBS 120 SL Elba Concrete-Mixing Plant features a frequency-controlled skip hoist. It offers theoretical output of up to 121m³/hour yet has minimal space requirements. Most of the components are galvanised to ensure maximum protection against corrosion.

Beton opted for the Ammann CEM 2660S Elba Single-Shaft Compulsory Mixer with its double helix. High mixing intensity and fast homogenisation are the hallmarks of the mixer.

“Simple operation and good access for maintenance were key factors in our decision to purchase this plant,” said Rainer Brings, chief executive of Beton.

Due to on-site conditions at Elmshorn, the Ammann CEL 210/6 Elba Linear Storage Bin was lowered by 3m to allow grade-level filling. This eliminated the need for an approach ramp, and additives such as steel fibres are now discharged directly onto the weighing belt at grade level. The opposite filling opening was increased to optimise filling and utilisation of the chamber volume. The segment dosing seals are operated pneumatically and their opening width can be adjusted freely.

“We are also able to handle the production of special concrete varieties and other difficult assignments with the accustomed quality,” said Brings.

Plant specifications were defined quickly and construction started promptly.

In its basic version, the Ammann CBS Elba plant is installed on concrete foundations, but mounting on a steel frame without foundations is equally possible. Chamber walls and partitions are keyed for assembly of the linear batcher. Pre-installation of components such as the skip hoist track and the segment dosing seals saves time on-site.

At winter temperatures, smooth mixing is ensured by the insulated housing together with a hot air/hot water system to heat the aggregates in the linear batcher and the feed water needed for the concrete.

For more information on companies in this article

Related Content

  • Innovations for asphalt compaction
    June 15, 2012
    Asphalt compaction advances were unveiled from an array of manufacturers at the INTERMAT 2012 event - Mike Woof reports. With new emissions legislation being introduced, manufacturers are rolling out a range of new asphalt compaction models designed to meet the latest requirements. These include both large rollers for high-production highway operations and compact machines designed for the rental market and suited to urban applications, with the latter segment becoming particularly competitive at present.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways