Skip to main content

Astec’s Batch RAP stems ahead

Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer. The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where Astec’s Batch RAP system comes into play. “The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according t
August 24, 2016 Read time: 3 mins
Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer.

The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where 1250 Astec’s Batch RAP system comes into play.

“The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according to engineer Mike Varner, director of thermal systems and research for US-based Astec. “Water expands 1,700 times when it changes to steam and when that occurs over a few seconds, you create a huge amount of steam.”

Greg Renegar, chief engineer at Astec, says the plant’s exhaust system has no way to accommodate that steam. “The baghouse can’t handle the amount of steam produced when water and RAP are dropped in.”

According to Varner, the addition of 25% RAP to a 2.76tonne batch is the equivalent of adding 5%, or approximately 34kg, of moisture.

“That 34kg of moisture turns into almost 60m3 of steam,” says Varner. “A baghouse fan cannot suck hard enough to keep up with the steam. Dust and steam will come out of every crack at the top of the plant.”

By using the Batch RAP system rather than “dumping in” the RAP in a five-second time frame, recycled material is dribbled in at a rate of 1% of RAP per second.

With the variable speed for the feeder belt, which introduces RAP directly into the pug mill, the introduction of RAP is at a more reasonable level. Controlling the speed and rate that RAP is fed into super-heated virgin material means steam that comes off the RAP as it hits the superheated mix can be eliminated or contained and controlled.

Varner said more companies are running RAP to remain competitive with continuous-mix plants. The Batch RAP system enables plant owners to use RAP on an old batch plant, which originally wasn’t set up for RAP use. The computer monitoring system hooks into the existing computer controls.

In the north-eastern US, Varner says that RAP is available from milling several miles of roads, and older plants in that region of the country need additional RAP facilities. Also, continuous plants can run 30-40% of RAP, while batch plants typically don’t run RAP well.

“The whole intent of the Batch RAP system is to make the introduction of RAP as continuous as possible for a batch plant,” says Varner. “That means less strain on the exhaust system and makes the batch plant more like a continuous plant in respect to RAP.”

For more information on companies in this article

Related Content

  • Road repairs fuel demand for milling machines
    February 13, 2012
    A need for road repairs is fuelling demand for new milling machines, Mike Woof reports. With many roads in Europe and North America needing repairs, manufacturers continue to meet demand by offering improved compact milling machines, as well as full-sized planers. The versatile and manoeuvrable compact machines can play a useful role in on-site recycling jobs for urban road improvements while the larger mills can be vital for in-situ recycling work.
  • Eurobitume Congress: Prague promises
    June 22, 2016
    Held every four years, the Eurasphalt and Eurobitume congresses have a reputation for revealing developments that will shape the future of bitumen use on Europe’s roads. This year’s event in Prague promises to uphold that reputation. By Kristina Smith The list of locations for the Eurobitume and Eurasphalt (E&E) Congresses reads like a traveller’s dream itinerary: Strasbourg, Barcelona, Vienna, Copenhagen, Istanbul. Now the beautiful city of Prague has been added to the list. Between 1-3 June, presenter
  • Thermal Road Repairs heats up the pavement surfacing market
    November 28, 2016
    UK-based company Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing. The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road,
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance