Skip to main content

Asphalt plant helping construction works

An asphalt plant from Ammann is helping with the development of a new urban area in China. Lanzhou New District is essentially a city that is being built from scratch. The district will be 49km long and 23km wide when complete, 10 years from now.
February 18, 2020 Read time: 2 mins
An urban development project in China is being assisted by an Ammann asphalt plant

This is a long and large project, the biggest national new district in China, according to Gansu Road & Bridge Maintenance Corp. However, the development of the district, the fifth in China, is essential to the country’s future. It provides an important connection between the Silk Road Economic Belt and the Eurasian continental bridge. The Silk Road Economic Belt is one component of the larger Belt and Road Initiative, an enormous nationwide infrastructure development project.

The Ammann ABA 320 UniBatch Asphalt-Mixing Plant will produce asphalt for all elements of the district’s infrastructure. The plant will operate almost continuously over the next decade to supply asphalt.

The project will deliver a modern, small-scale city on the Silk Road and provide a key industrial base for the country. The Lanzhou area is mostly undeveloped and the few asphalt plants there or nearby are low-cost, domestic alternatives that offer limited technology and production.

Gansu Road & Bridge opted for the Ammann plant in part due to its extremely low emissions. The Chinese government has dictated that emissions be minimised and other sustainable efforts taken – including covering the entire plant to lessen dust and reduce sound.

ABA UniBatch plants utilise an efficient drying and heating process that conserves energy and ultimately reduces costs. The burner control regulates the drying process to ensure reduced fuel consumption and low emissions.

For more information on companies in this article

Related Content

  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated
  • Premium output from Ammann’s HRT Asphalt Plant
    March 31, 2025

    The High Recycling Technology (HRT) Asphalt Batch Plant is a premium Ammann plant, with advanced technologies. It can incorporate up to 100% RAP with extremely low energy consumption and emissions.

    The double-drum system combines a virgin aggregate drum with either an RAH60 or RAH100 recycling drum. Indirect, gentle heating reduces fuel burn and emissions. Heat distribution is more homogenous, too, which prevents sticking – as does the vertical flow.

  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.