Skip to main content

Accurate, efficient drilling system

Moba’s MDS-2000 Drilling System is being used for the first time in a South American quarry. Used over two shifts by operators since September 2011 to monitor and control drill blast holes at a granite quarry in Vacamonte, Panama, Moba has equipped an HCR-1200 EDII type drilling device from FRD Furukawa Rock Drill with the drilling system in collaboration with B-B-S Bohrsysteme. The MDS-2000 enables drill holes to be made parallel to each other and to the desired depth and pre-set angle.
April 13, 2012 Read time: 2 mins

Moba’s MDS-2000 Drilling System is being used for the first time in a South American quarry.

Used over two shifts by operators since September 2011 to monitor and control drill blast holes at a granite quarry in Vacamonte, Panama, 1228 MOBA has equipped an HCR-1200 EDII type drilling device from FRD Furukawa Rock Drill with the drilling system in collaboration with B-B-S Bohrsysteme.

The MDS-2000 enables drill holes to be made parallel to each other and to the desired depth and pre-set angle. As well as cost and time savings from not having to redrill faulty drill holes, Moba said the process also allows for blasting with smooth brims, making quarry work safer. Working with a two axis slope sensor with an angular range of ± 60° as well as three rotary sensors, the MDS-2000 records all drilling data such as drill hole depth, drill angle and time per drilling and forwards it to the controller, where it is processed and displayed.

With the MDS-2000’s integrated MTS-001 Telematics System, information can be efficiently exchanged between the drilling device and the office. All drilling and machine data is sent to a server via a GSM module. From the server, the data can be loaded and displayed onto a PC or a mobile device with Internet. This means the current status of the project and the machine can be called up from the office or anywhere else at any time. The position of the machine is displayed in a digital map. Meanwhile, the system allows a machine operator to see data in the cab on a five-inch HMI GD-320 display. A digital output can be switched on the MC-120 Controller via telematic data transfer through the remote control of the machine. Moba said this direct link to the system can be used to access the motor control and stop the motor via remote control, preventing a machine’s theft or misuse.

The MDS-2000 system has been praised by management at FRD Latin America.

For more information on companies in this article

Related Content

  • Cultivate better on-site safety awareness by leveraging technology with Leica Geosystems
    August 10, 2023
    When a vital fiber-optic cable was cut during construction work in Germany, the impact was huge. There were telecom disruptions affecting the greater Frankfurt area, all departures and landings at Frankfurt Airport were suspended, and Lufthansa’s global IT system crashed. Leica Geosystems says it is vital to put in place “strategies to protect people, equipment, and assets… and to emphasise the crucial role digital solutions play in ensuring safety.”
  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders
  • Key developments are changing the face of the machine control market
    April 4, 2013
    Various business moves are changing the face of the machine control sector - Mike Woof reports An array of developments, both business moves and new technologies, are changing the focus for the machine control segment of the construction equipment sector. For a long time three firms, Leica Geosystems, Trimble and Topcon, have dominated this segment. The three are retaining their strong positions in the market but are seeing additional competition from Hemisphere and MOBA. Arguably the biggest news is that T
  • MOBA’s World Cup highway mission
    April 23, 2013
    The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula.