Skip to main content

Accurate, efficient drilling system

Moba’s MDS-2000 Drilling System is being used for the first time in a South American quarry. Used over two shifts by operators since September 2011 to monitor and control drill blast holes at a granite quarry in Vacamonte, Panama, Moba has equipped an HCR-1200 EDII type drilling device from FRD Furukawa Rock Drill with the drilling system in collaboration with B-B-S Bohrsysteme. The MDS-2000 enables drill holes to be made parallel to each other and to the desired depth and pre-set angle.
April 13, 2012 Read time: 2 mins

Moba’s MDS-2000 Drilling System is being used for the first time in a South American quarry.

Used over two shifts by operators since September 2011 to monitor and control drill blast holes at a granite quarry in Vacamonte, Panama, 1228 MOBA has equipped an HCR-1200 EDII type drilling device from FRD Furukawa Rock Drill with the drilling system in collaboration with B-B-S Bohrsysteme.

The MDS-2000 enables drill holes to be made parallel to each other and to the desired depth and pre-set angle. As well as cost and time savings from not having to redrill faulty drill holes, Moba said the process also allows for blasting with smooth brims, making quarry work safer. Working with a two axis slope sensor with an angular range of ± 60° as well as three rotary sensors, the MDS-2000 records all drilling data such as drill hole depth, drill angle and time per drilling and forwards it to the controller, where it is processed and displayed.

With the MDS-2000’s integrated MTS-001 Telematics System, information can be efficiently exchanged between the drilling device and the office. All drilling and machine data is sent to a server via a GSM module. From the server, the data can be loaded and displayed onto a PC or a mobile device with Internet. This means the current status of the project and the machine can be called up from the office or anywhere else at any time. The position of the machine is displayed in a digital map. Meanwhile, the system allows a machine operator to see data in the cab on a five-inch HMI GD-320 display. A digital output can be switched on the MC-120 Controller via telematic data transfer through the remote control of the machine. Moba said this direct link to the system can be used to access the motor control and stop the motor via remote control, preventing a machine’s theft or misuse.

The MDS-2000 system has been praised by management at FRD Latin America.

For more information on companies in this article

Related Content

  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • MOBA technology used on key Russian highway
    May 30, 2013
    The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula. Completion of the US$32.55 million (1bn RUB) project is scheduled for 2015 and should allow comfortable travel for residents, tourists and football fans travelling to t
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un