Skip to main content

Vulcan Burners scores major order for natural gas project

Asphalt Burner Services (ABS), the Northern Irish designers and manufacturers of energy-efficient asphalt burners, have recently installed a Vulcan dual-fuel and natural gas burner for FP McCann, one of the region’s leading civil engineering, construction and building companies.
April 16, 2015 Read time: 2 mins

4720 Asphalt Burner Services (ABS), the Northern Irish designers and manufacturers of energy-efficient asphalt burners, have recently installed a Vulcan dual-fuel and natural gas burner for FP McCann, one of the region’s leading civil engineering, construction and building companies.

The contract is the result of a tender from FP McCann for a replacement for their existing burner that would provide significant costs savings and increase the overall competitiveness of the business in today’s challenging markets.

FP McCann, based at Magherafelt in Co. Derry, are working at Boyd’s Quarry at Mallusk, near Belfast, a major source of high-grade aggregates for a wide range of construction and infrastructure projects.

Ian Lewis, ABS burner design engineer, said: ‘While we’ve been working with FP McCann for more than eight years in servicing and maintaining the existing burner and also involved in a wide range of the asphalt operations, we were delighted to win the competitive tender for a new burner.

‘We were successful because our new Vulcan burner dual-fuel and natural gas V16 burner has an established track record with major international operators in the provision of significant operational savings.

‘This is the first asphalt plant in Northern Ireland to install the Vulcan burner system to existing operations and is a very timely boost at a time when construction here has been adversely impacted by the economic downturn.

‘The Vulcan system was chosen as part of a substantial investment that includes the extension of natural gas to the asphalt plant within the quarry. FP McCann have invested substantially to upgrade systems particularly in terms of costs because the market here is now more competitive than ever. Making existing plants run more efficiently helps in the process of winning contracts as well as improving performance on environmental issues including a significant reduction in carbon emissions.’

Kieran Fields, FP McCann’s marketing manager, stated: ‘Like most companies, the economic downturn made companies focus manufacturing efficiencies in order to remain competitive. The installation of the Vulcan burner has reflected a 20% decrease in fuel and the installation of natural gas to our Mallusk plant has seen an important step in reducing our carbon footprint.’

The McCann contract is among a series of significant projects being carried out by ABS during 2013.

The Northern Irish company is undertaking important contracts for industry leaders such as Aggregate Industries, Cemex UK Materials and Eurovia Infrastructure. They have also secured significant business in China from a leading contractor there.

For more information on companies in this article

Related Content

  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams
  • Get paid faster for your work by being efficient, optimised, and careful with resources… get connected now
    September 1, 2023
    In this, the third roundtable meeting in World Highways’ series of Connected Construction discussions, Guy Woodford discusses the implications of developments in artificial intelligence (AI) and machine control with world-class experts in their field. Find out what Elwyn McLachlan, vice president of Civil Solutions at Trimble, Murray Lodge, senior vice president and general manager of Construction at Topcon Positioning Group, and Magnus Thibblin, vice president Heavy Construction at Hexagon Geosystems have to say about how you should be positioning your company for a successful future.
  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • World of Asphalt/AGG1 Aggregates Forum & Expo
    April 13, 2012
    World of Asphalt 2012 and the co-located AGG1 Aggregates Forum & Expo will be the largest in the history of the two events.