Skip to main content

Polish road dispute

Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.
March 2, 2012 Read time: 1 min
Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) is asking the consortium that built the S8 link, which comprises, 3302 Budimex 3546 Dromex, 945 Strabag, 3544 Warbud and 3304 Mostostal Warszawa, to repair the affected section. GDDKiA has said that the asphalt density is too low and there are cracks in the road. However, the consortium has responded that the problems have arisen as the project schedule called for work to be carried out during winter, causing fast cooling of the asphalt mat, which affected compaction.

Related Content

  • Poland is planning a series of highway projects
    March 15, 2013
    Poland’s Ministry of Transport plans to invest heavily in road projects from 2014-2020. The Polish road authority, GDDKiA, will invest €16.91 billion in new roads. A key project will be for the section of the Berlin-Lisbon A2 highway that runs through Poland. This will run through Zakret near Warsaw and connect to the Minsk Mazowiecki ring road and is expected to cost close to €1.7 billion. Meanwhile the A1 highway linking Pyrzowice and Tuszyn will cost in excess of €1.8 billion. GDDKiA is also planning to
  • Reduced temperature asphalt in road construction
    January 17, 2022
    The use of reduced temperature asphalt in a road construction project in Germany has helped to lower emissions
  • Latest bitumen mixes improve roads, reduce noise
    February 14, 2012
    Special bitumen mixes and machines are capable of improving the service life of roads and reducing noise. Mike Woof and Patrick Smith report. The need to improve traffic flow in an important part of the City of Poznan, Poland, led to the decision to build a new 1.13km long dual carriageway.
  • Velocity-Balfour Beatty tackling potholes
    May 13, 2014
    It is the bugbear of motorists worldwide, and costs UK councils alone an estimated US$82.12 million (£50 million) in compensation each year. Now Balfour Beatty is partnering with specialist supplier Velocity and North Somerset Council in south-west England to tackle potholes using innovative technology which vastly reduces disruption to road users. The method, called ‘Spray Injection’ patching, is allowing Balfour Beatty to repair nearly 700 potholes a week on its highways maintenance contract repairing