Skip to main content

Polish road dispute

Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.
March 2, 2012 Read time: 1 min
Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) is asking the consortium that built the S8 link, which comprises, 3302 Budimex 3546 Dromex, 945 Strabag, 3544 Warbud and 3304 Mostostal Warszawa, to repair the affected section. GDDKiA has said that the asphalt density is too low and there are cracks in the road. However, the consortium has responded that the problems have arisen as the project schedule called for work to be carried out during winter, causing fast cooling of the asphalt mat, which affected compaction.

Related Content

  • Polish tunnel opening to traffic
    July 5, 2023
    The Polish Swina tunnel is opening to traffic.
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.
  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public