Skip to main content

Landmark new UK bridge project

COWI is working on a landmark UK bridge project.
By MJ Woof December 2, 2020 Read time: 2 mins
The Carrington Bridge is the first in the UK to feature a new steel grade - image © courtesy of Alun Griffiths Contractors Ltd
The new Carrington Bridge project in Worcester is the first UK bridge to use a new higher-strength grade of weathering steel. This S460W material offers structural and environmental benefits.

Using this stronger grade of steel enabled the COWI design team to reduce the total material quantity by 15%, resulting in a more sustainable structure. The reduced quantity of steel reduces associated carbon emissions from manufacturing and transport. The use of corrosion-resistant weathering steel means the steelwork does not require painting, a further environmental benefit.

The use of weathering steel also made it easier to transport and lift the girders. These were delivered to site in segments of up to 48m, then spliced into whole-span lengths of 80m before being lifted onto their supports by a 1,200tonne capacity mobile crane, one of the UK’s largest. The final two crane lifts over the River Severn were achieved at a radius of 80m with the crane boom extended to its maximum length of 180m.

COWI won the work on the project with Alun Griffiths Contractors, as part of an ECI scheme, to design the three-span composite road bridge, as well as the geotechnical design of the road embankment, retaining walls and slope stabilisation measures. The bridge has a total length of 205m and forms part of the Worcester Southern Link Road project, which will convert the A4440 from single to dual carriageway, relieving traffic congestion in the area. The steelwork for Carrington Bridge was fabricated and installed by Cleveland Bridge.

The 2.5km long highway scheme includes another significant viaduct as well as a landmark footbridge, also designed by COWI. In addition to designing the structures, COWI was also responsible for all of the geotechnical design of the project, including earthworks. Completion of the bridge is planned for spring 2021.

For more information on companies in this article

Related Content

  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • From rubber to nanotechnology, new additives give longer life
    March 12, 2014
    This month: rubber comes to the rescue for cash-strapped UK authorities and Italian towns plagued by road noise; Japanese nanotechnology fights monsoon damage in India; and a new research programme promises to help define whether ‘sustainable’ bitumen technologies really live up to their billing - Kristina Smith writes A new venture in the UK aims to encourage the use of recycled tyres in road pavements. Billian UK is now manufacturing GTR Pellets which combine bitumen, ground tyre rubber (GTR) and miner
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.