Skip to main content

Landmark new UK bridge project

COWI is working on a landmark UK bridge project.
By MJ Woof December 2, 2020 Read time: 2 mins
The Carrington Bridge is the first in the UK to feature a new steel grade - image © courtesy of Alun Griffiths Contractors Ltd
The new Carrington Bridge project in Worcester is the first UK bridge to use a new higher-strength grade of weathering steel. This S460W material offers structural and environmental benefits.

Using this stronger grade of steel enabled the COWI design team to reduce the total material quantity by 15%, resulting in a more sustainable structure. The reduced quantity of steel reduces associated carbon emissions from manufacturing and transport. The use of corrosion-resistant weathering steel means the steelwork does not require painting, a further environmental benefit.

The use of weathering steel also made it easier to transport and lift the girders. These were delivered to site in segments of up to 48m, then spliced into whole-span lengths of 80m before being lifted onto their supports by a 1,200tonne capacity mobile crane, one of the UK’s largest. The final two crane lifts over the River Severn were achieved at a radius of 80m with the crane boom extended to its maximum length of 180m.

COWI won the work on the project with Alun Griffiths Contractors, as part of an ECI scheme, to design the three-span composite road bridge, as well as the geotechnical design of the road embankment, retaining walls and slope stabilisation measures. The bridge has a total length of 205m and forms part of the Worcester Southern Link Road project, which will convert the A4440 from single to dual carriageway, relieving traffic congestion in the area. The steelwork for Carrington Bridge was fabricated and installed by Cleveland Bridge.

The 2.5km long highway scheme includes another significant viaduct as well as a landmark footbridge, also designed by COWI. In addition to designing the structures, COWI was also responsible for all of the geotechnical design of the project, including earthworks. Completion of the bridge is planned for spring 2021.

For more information on companies in this article

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.