Skip to main content

How to maintain a city road by day and Formula 1 track by night

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, which
February 22, 2019 Read time: 2 mins
Shell Bitumen’s high-performance binder, Shell Cariphalte is being used at the Singapore F1 race track

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, 763 Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works.

The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%.

The 5km Marina Bay Street Circuit, which saw the first ever night-time race back in 2008, must withstand the rigours of everyday traffic as well as the occasional impacts of F1 racing cars travelling at over 300kph and braking around its 23 turns.

Shell Cariphalte was selected for the task because it has been designed to resist extreme heat, rutting, cracking, stripping and ageing. Its tough three-dimensional polymer network gives increased stiffness at high temperatures and low stiffness at low temperatures, increasing the performance range of the pavement and reducing the risk of cracking which is common for surfaces under high stress, says Shell Bitumen.

The resurfacing work, carried out by contractor United E&P, involved laying new asphalt around several of the turn areas. There were also minor changes to Turn 16 and 17, according to motorsport websites, which have been realigned, resulting the in length of the course being reduced by 2m to 5.063km. The work was carried out during the night, when there is less traffic, to minimise disruption.

For more information on companies in this article

Related Content

  • Bitumen challenges and opportunities for the road construction sector
    December 12, 2018
    The road sector faces challenges with regard to bitumen - Gülay Malkoç reports
  • Tailor made pavement preservation solutions
    March 16, 2012
    VSS Macropaver is well known worldwide for offering customers individualised solutions for their emulsion blending needs.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Iconic Dunlop bridge replaced
    February 24, 2012
    Work is underway to redevelop Donington Park motor racing circuit in the UK in readiness for the 2010 British Formula 1 Grand Prix.