Skip to main content

How to maintain a city road by day and Formula 1 track by night

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, which
February 22, 2019 Read time: 2 mins
Shell Bitumen’s high-performance binder, Shell Cariphalte is being used at the Singapore F1 race track

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, 763 Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works.

The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%.

The 5km Marina Bay Street Circuit, which saw the first ever night-time race back in 2008, must withstand the rigours of everyday traffic as well as the occasional impacts of F1 racing cars travelling at over 300kph and braking around its 23 turns.

Shell Cariphalte was selected for the task because it has been designed to resist extreme heat, rutting, cracking, stripping and ageing. Its tough three-dimensional polymer network gives increased stiffness at high temperatures and low stiffness at low temperatures, increasing the performance range of the pavement and reducing the risk of cracking which is common for surfaces under high stress, says Shell Bitumen.

The resurfacing work, carried out by contractor United E&P, involved laying new asphalt around several of the turn areas. There were also minor changes to Turn 16 and 17, according to motorsport websites, which have been realigned, resulting the in length of the course being reduced by 2m to 5.063km. The work was carried out during the night, when there is less traffic, to minimise disruption.

For more information on companies in this article

Related Content

  • Asphalt plant innovations from key firms
    June 12, 2017
    Asphalt plant builders continue to develop new technologies to meet different demands from clients. Marini says that in addition to developing new and more sophisticated asphalt plants, the firm is also meeting demands from customers looking to upgrade existing asphalt plants with the addition of new systems. These can be used to boost output and material quality, while also delivering new grades of mixes. At the same time, plant upgrades can reduce the environmental profile of a plant, while improving its
  • Accurate milling and paving with Wirtgen
    March 15, 2022
    Equipment from the Wirtgen Group, including equipment from Vögele, Hamm and Benninghoven, have been used to resurface the Silverstone circuit
  • Market development of low temperature asphalt in the UK
    November 20, 2014
    New developments in low temperature asphalt offer both cost and environmental benefits - Dr Nizar Ghazireh (Lafarge Tarmac) & Dennis Day (Nynas Bitumen) Low temperature asphalt (LTA) technology has considerable potential for reducing carbon emissions associated with road construction. The lower temperatures used to manufacture these materials mean that less energy is required and therefore lower emissions, which create better working conditions and result in lower impact on the environment.
  • Resilient roads: cooperation is key
    June 14, 2021
    Now is the time for national road agencies and the private sector to cooperate on building more climate resilient roads, urges Dr Erik Denneman