Skip to main content

How to maintain a city road by day and Formula 1 track by night

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, which
February 22, 2019 Read time: 2 mins
Shell Bitumen’s high-performance binder, Shell Cariphalte is being used at the Singapore F1 race track

Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, 763 Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works.

The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%.

The 5km Marina Bay Street Circuit, which saw the first ever night-time race back in 2008, must withstand the rigours of everyday traffic as well as the occasional impacts of F1 racing cars travelling at over 300kph and braking around its 23 turns.

Shell Cariphalte was selected for the task because it has been designed to resist extreme heat, rutting, cracking, stripping and ageing. Its tough three-dimensional polymer network gives increased stiffness at high temperatures and low stiffness at low temperatures, increasing the performance range of the pavement and reducing the risk of cracking which is common for surfaces under high stress, says Shell Bitumen.

The resurfacing work, carried out by contractor United E&P, involved laying new asphalt around several of the turn areas. There were also minor changes to Turn 16 and 17, according to motorsport websites, which have been realigned, resulting the in length of the course being reduced by 2m to 5.063km. The work was carried out during the night, when there is less traffic, to minimise disruption.

For more information on companies in this article

Related Content

  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • Kraton expands duty range of its polymer products
    August 23, 2013
    The pavement industry needs to come up with novel solutions in order to meet the twin challenges of climate change and squeezed budgets. This was the message from Kraton Polymers market development manager Rombout Hartemink when he addressed FIRM13. Hartemink illustrated the properties of Kraton’s modified bitumen with the aid of his stretchy bar. This 250mm-long bar of Highly Modified Bitumen stretches to five or six times its length, returning to its original state in around five minutes. “It changes
  • Nynas and Shell in Hanson UK bio-binder trial
    March 6, 2023
    Hanson UK is using Nynas’s biogenic binder Nypol RE in one asphalt mixture and Shell’s new bio-component binder Cariphalte CarbonSink in the second mix.
  • Polymer enhanced bitumen technology improves performance
    July 11, 2012
    As overall traffic volumes increase, the contribution from commercial vehicles with increased axle loads is growing, putting ever more strain on roads and highway maintenance budgets. Highway authorities are looking for products that will be able to cope better and are more cost effective over the life of a road. Technical innovation is the only way to answer this challenge effectively, says BP Bitumen, one of a number of specialist companies involved in bitumen technology.