Skip to main content

Colombian construction confusion considers concrete against asphalt

In Colombia a big debate is in hand between producers of asphalt and concrete as to which is best for building roads. Colombia has a major programme for road construction with some US$23.54 billion planned to be invested over the next 10 years. Large producers such as Holcim, Cemex and Argos, which sell most of the 11 million tonnes/year of cement consumed in Colombia are involved actively in the debate. Cement firms have estimated that the 15 road projects that are most advanced will need some 8 million to
January 29, 2014 Read time: 2 mins
In Colombia a big debate is in hand between producers of asphalt and concrete as to which is best for building roads. Colombia has a major programme for road construction with some US$23.54 billion planned to be invested over the next 10 years. Large producers such as 2813 Holcim, 3016 Cemex and Argos, which sell most of the 11 million tonnes/year of cement consumed in Colombia are involved actively in the debate. Cement firms have estimated that the 15 road projects that are most advanced will need some 8 million tonnes of asphalt and concrete for various infrastructural and decorative uses as well as the road surfaces, which are usually made with asphalt. Asphalt distributor Modern Energy Supply (MES) has, however, said that the asphalt currently used for Colombian roads will be cost-effective in terms of maintenance over the next 25 years, and that it could supply Ecopetrol to help lower maintenance costs. Concrete producers are said to be considering strategic alliances to convince engineers of the benefits of concrete, which may have higher initial costs, but in the long term require less maintenance. Representatives from both Argos and Cemex have argued that concrete is less susceptible to water damage and potholes. The asphalt suppliers say that asphalt roads have other advantages however. Although the Colombian Infrastructure Chamber (CCI) has said that asphalt and concrete complement each other, the Transport Ministry said in 2008 that the Corredores de Competitividad roads should be made with concrete. The CCI has requested that both alternatives be considered for these roads, as the decision is down to technical reasons outlined by the construction companies.

For more information on companies in this article

Related Content

  • Recycling advances from Wirtgen
    June 18, 2012
    German firm Wirtgen is retaining its lead in road recycling technologies – Mike Woof writes Tests on cold recycling with a new layer thickness using Wirtgen's sophisticated WR 4200 machine have shown impressive results according to the firm. The road construction and traffic authority Landesbetrieb Mobilität (LBM) Cochem-Koblenz commissioned a pilot project as part of its plan to optimise the cold in-place recycling process (CIR). The aim was to examine the extent to which the layer thickness can be reduced
  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • UK asphalt market: 'turning lower'
    February 29, 2012
    The UK asphalt market increased by over 5% in 2010 but the market has already started to turn lower, claims industry experts BDS Marketing Research, which is forecasting volumes to be around 1% lower in the current year
  • Time, money and the environment – reducing the costs of a road project
    April 23, 2013
    Road construction has evolved considerably in recent years and today more options are available, offering greater longevity and durability, lowered costs, faster application and reduced impact on the environment. The fact that more options are available, however, means that more critical decisions must be made in order to ensure that the optimal solution is selected for the specific needs of each project. In this article we will look at some of the variables that should be considered, while examining the va