Skip to main content

Cement supply for Mexico City

CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
August 15, 2018 Read time: 2 mins
CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week.


Working under a turnkey project scheme, 3016 CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development.

To meet the necessary quality requirements for the project, CEMEX had to carry out ground analysis prior to any construction work. However, this highlighted that the land was unstable, revealing that the poor conditions would make paving complicated using conventional processes.

As a result, CEMEX recommended the use of 5,000m3 of a special mix designed to level difficult ground. This mix was selected as it would allow paving even during rainfall periods, as well as allowing the roads to be opened in just one day. This minimised traffic interruption in the area during work hours.

“For this project, CEMEX delivered technology, knowledge, and above all, punctuality, crucial for the completion of such a large-scale project in only 13 months - a record from a construction standpoint,” said architect Mario Schjetnan, who was in charge of the design of the La Mexicana park, together with architect Víctor Márquez.

Thanks to the opening of the new roads, over 20,000 people are now able to visit this park every weekend. In addition to the pavement of new roads, CEMEX participated in the construction of a tunnel that connects the roads to the park, and facilities such as a jogging and walking track and cycle tracks.

For more information on companies in this article

Related Content

  • Rebuilding better gravel roads more efficiently
    October 15, 2015
    Using a linear road crusher can rebuild gravel roads using material onsite at a fraction of the cost of conventional methods. Gravel roads are common in many rural areas in the US to provide access to temporary work sites and are also used widely in developing countries. Maintaining and repairing these roads can pose challenges and new methods may offer improvements in efficiency.
  • Manchester focuses on Cyclops junction
    July 20, 2020
    Manchester City has an eye for a better cycling experience.
  • CPB Contractors closes deal for Melbourne’s West Gate Tunnel
    December 13, 2017
    CPB Contractors has achieved contractual close on Melbourne’s planned 5km West Gate Tunnel, originally called the Western Distributor. The road will link the West Gate Freeway at Yarraville, a suburb of Melbourne, with the tolled CityLink road network at Docklands via a tunnel beneath Yarraville.
  • Mexico has major plans to improve transport network
    December 13, 2013
    Mexico’s transport and communications ministry (SCT) looks set to open tenders for 258 highway projects in 2014. Tenders for 13 projects covering work to repair, upgrade and widen over 2,000km of roads have already been revealed. Tenders being opened will also include building bridges and bypasses around congested urban areas. Key tenders include 48 in Chiapas, 35 projects in Oaxaca, 24 in San Luis Potosi and 11 in Guerrero and Veracruz. The road projects will account for some 20% of the overall infrastruct