Skip to main content

Cement supply for Mexico City

CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
August 15, 2018 Read time: 2 mins
CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week.


Working under a turnkey project scheme, 3016 CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development.

To meet the necessary quality requirements for the project, CEMEX had to carry out ground analysis prior to any construction work. However, this highlighted that the land was unstable, revealing that the poor conditions would make paving complicated using conventional processes.

As a result, CEMEX recommended the use of 5,000m3 of a special mix designed to level difficult ground. This mix was selected as it would allow paving even during rainfall periods, as well as allowing the roads to be opened in just one day. This minimised traffic interruption in the area during work hours.

“For this project, CEMEX delivered technology, knowledge, and above all, punctuality, crucial for the completion of such a large-scale project in only 13 months - a record from a construction standpoint,” said architect Mario Schjetnan, who was in charge of the design of the La Mexicana park, together with architect Víctor Márquez.

Thanks to the opening of the new roads, over 20,000 people are now able to visit this park every weekend. In addition to the pavement of new roads, CEMEX participated in the construction of a tunnel that connects the roads to the park, and facilities such as a jogging and walking track and cycle tracks.

For more information on companies in this article

Related Content

  • LA’s Ribbon of Light viaduct cast into darkness
    January 10, 2024
    Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
  • International cooperation agreement signed for engineering
    September 2, 2019
    A crucial agreement has been signed that will pave the way for greater international cooperation on engineering projects. A memorandum of understanding (MoU) has been signed between the International engineering federation FIDIC (the International Federation of Consulting Engineers) and the China Engineering and Consulting Association (CECA). The aim of this is to improve collaboration between international and Chinese businesses across a number of key areas. The move will also help to improve the competenc
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Tackling Europe’s urban road safety problems
    June 12, 2019
    Urban road safety is a key problem in Europe, an issue that needs to be addressed as a priority. That is the finding of a new report by the European Transport Safety Council (ETSC). The ETSC’s report reveals that road deaths on urban roads decreased at around half the rate of those on rural roads over the period 2010-2017. The report also shows that vulnerable road users such as pedestrians, cyclists and motorcyclists, account for 70% of those killed and seriously injured on urban roads. Dovilė Adminaitė-