Skip to main content

Cement supply for Mexico City

CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
August 15, 2018 Read time: 2 mins
CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week.


Working under a turnkey project scheme, 3016 CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development.

To meet the necessary quality requirements for the project, CEMEX had to carry out ground analysis prior to any construction work. However, this highlighted that the land was unstable, revealing that the poor conditions would make paving complicated using conventional processes.

As a result, CEMEX recommended the use of 5,000m3 of a special mix designed to level difficult ground. This mix was selected as it would allow paving even during rainfall periods, as well as allowing the roads to be opened in just one day. This minimised traffic interruption in the area during work hours.

“For this project, CEMEX delivered technology, knowledge, and above all, punctuality, crucial for the completion of such a large-scale project in only 13 months - a record from a construction standpoint,” said architect Mario Schjetnan, who was in charge of the design of the La Mexicana park, together with architect Víctor Márquez.

Thanks to the opening of the new roads, over 20,000 people are now able to visit this park every weekend. In addition to the pavement of new roads, CEMEX participated in the construction of a tunnel that connects the roads to the park, and facilities such as a jogging and walking track and cycle tracks.

For more information on companies in this article

Related Content

  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac
  • Moscow city government to build relief roads and highways
    June 6, 2016
    Moscow’s congestion problems need addressing but there are different solutions that could provide the answer – Eugene Gerden writes Moscow’s city government is considering building relief roads to ease congestion on the city’s key roads and highways. This plan has been revealed by recent statements from Marat Khusnullin, deputy mayor for urban policy and construction of the Moscow city government.
  • Tunnel construction at Mexican extraction operation
    April 16, 2018
    The innovative Carmix 3500 TC unit is now being put to work at the Concheño underground extraction operation in Mexico This operation in the state of Chihuahua was opened in 2013 and can produce 15000tonnes/day. In this context, Minera Real de Angeles opted for four Carmix 3500 TC machines for the construction of access roads. The machine is said to be both versatile and productive, while its comparatively compact dimensions are well suited to underground use. The unit was supplied to the customer by Car