Skip to main content

Cement supply for Mexico City

CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
August 15, 2018 Read time: 2 mins
CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week.


Working under a turnkey project scheme, 3016 CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development.

To meet the necessary quality requirements for the project, CEMEX had to carry out ground analysis prior to any construction work. However, this highlighted that the land was unstable, revealing that the poor conditions would make paving complicated using conventional processes.

As a result, CEMEX recommended the use of 5,000m3 of a special mix designed to level difficult ground. This mix was selected as it would allow paving even during rainfall periods, as well as allowing the roads to be opened in just one day. This minimised traffic interruption in the area during work hours.

“For this project, CEMEX delivered technology, knowledge, and above all, punctuality, crucial for the completion of such a large-scale project in only 13 months - a record from a construction standpoint,” said architect Mario Schjetnan, who was in charge of the design of the La Mexicana park, together with architect Víctor Márquez.

Thanks to the opening of the new roads, over 20,000 people are now able to visit this park every weekend. In addition to the pavement of new roads, CEMEX participated in the construction of a tunnel that connects the roads to the park, and facilities such as a jogging and walking track and cycle tracks.

For more information on companies in this article

Related Content

  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • I-95 Corridor Coalition vehicle probe project massively expanded
    May 4, 2012
    The I-95 Corridor Coalition, the University of Maryland and Inrix have announced a three-year extension and expansion of the I-95 Coalition Vehicle Probe Project (VPP), operational since 2008, that uses crowd-sourced traffic data and advanced analytics techniques to turn billions of data points into insights that are transforming the manner in which member states build, manage and measure their road networks.
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai