Skip to main content

Cement supply for Mexico City

CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week. Working under a turnkey project scheme, CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development. To meet the necessary
August 15, 2018 Read time: 2 mins
CEMEX has supplied over 44,000m3 of concrete for road pavement and infrastructure development of the La Mexicana Park area in Mexico City. The former mine is located in the city’s Santa Fe area, which has been reclaimed as a public space and now attracts more than 20,000 people/week.


Working under a turnkey project scheme, 3016 CEMEX paved the new four-lane roads surrounding the park - Luis Barragan and Paseo de los Arquitectos avenues - an area totaling 35,000m2 with 3km of development.

To meet the necessary quality requirements for the project, CEMEX had to carry out ground analysis prior to any construction work. However, this highlighted that the land was unstable, revealing that the poor conditions would make paving complicated using conventional processes.

As a result, CEMEX recommended the use of 5,000m3 of a special mix designed to level difficult ground. This mix was selected as it would allow paving even during rainfall periods, as well as allowing the roads to be opened in just one day. This minimised traffic interruption in the area during work hours.

“For this project, CEMEX delivered technology, knowledge, and above all, punctuality, crucial for the completion of such a large-scale project in only 13 months - a record from a construction standpoint,” said architect Mario Schjetnan, who was in charge of the design of the La Mexicana park, together with architect Víctor Márquez.

Thanks to the opening of the new roads, over 20,000 people are now able to visit this park every weekend. In addition to the pavement of new roads, CEMEX participated in the construction of a tunnel that connects the roads to the park, and facilities such as a jogging and walking track and cycle tracks.

For more information on companies in this article

Related Content

  • ULMA on the Guadiana Bridge
    October 5, 2021
    Heavy onsite winds and the simultaneous renovation of both pylons were challenges for ULMA when it supplied scaffolding for work on the Guadiana International Bridge
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • A wheely great bridge for the English city of Hull
    November 6, 2019
    A 60m pre-constructed pedestrian bridge weighing 150 tonnes as been wheeled into position over the A63 in the northern English city of Hull. The covered and vaulted Princess Quays Bridge will be renamed when it opens in the spring enabling pedestrians and cyclists to cross over the busy dual carriageway. The positioning operation meant that first the route was cleared of signage, guardrails and street lights. The bridge was then lowered onto two wheeled transporters – one at each end of the structur
  • Super paving with Aggregate Industries’ SuperThin
    February 21, 2019
    Aggregate Industries’ contracting division recently laid a total of 1,800 tonnes of an ultra-low noise asphalt at Brampton Hut Services in Huntingdon in one weekend. Section 1 of Highways England’s A14 Cambridge-to-Huntingdon Improvement Scheme will see 21km of the road upgraded to three lanes in each direction and is expected to cut journey times by up to 20 minutes. The pavement works at Brampton Hut motorway services specified minimum sound level requirements of -7.5db (A). The limits are designed