Skip to main content

Call for rising bitumen cost to be factored into highways contracts

Rising bitumen prices should be factored in more consistently when awarding highways contract tenders, according to Tarmac National Constructing (TNC). The near 60% bitumen price hike of the last two years, driven by a major decrease in European refinery production, is said by TNC to be making it “extremely difficult” for highways contractors to tender for work, as current price fluctuation mechanisms do not fairly compensate for significant extra input costs. TNC says that while the Highways Agency’s
April 20, 2012 Read time: 2 mins
Rising bitumen prices should be factored in more consistently when awarding highways contract tenders, according to 2399 Tarmac National Constructing (TNC).

The near 60% bitumen price hike of the last two years, driven by a major decrease in European refinery production, is said by TNC to be making it “extremely difficult” for highways contractors to tender for work, as current price fluctuation mechanisms do not fairly compensate for significant extra input costs.

TNC says that while the 2309 Highways Agency’s Category Management Contracts and a minority of council tenders use appropriate price fluctuation mechanisms, they are not being consistently applied across all national network and local authority road contracts.

The leading UK road maintenance and highways services company says it is turning to alternative road construction methods with bitumen, which accounts for around a third of the cost of constructing a new road, being replaced with composite road construction on new build schemes.

Paul Fleetham, managing director of TNC and Middle East, said:

“With one of the largest UK refiners, 741 Petroplus, entering administration last month, the general trend is for less bitumen to be available, exerting additional cost pressures.

“The industry is at a tipping point as it tries to recover these exceptional increases on existing contracts and anticipate the negative impact these may have when tendering for future long-term highway works.”

For more information on companies in this article

Related Content

  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag
  • Symology supplies the foundations for Tarmac’s Street Works business
    April 7, 2017
    UK contractor Tarmac has been in partnership with Symology since 2011, using a shared management service for asset management to meet tougher government street work regulations, writes Matt Waite Tarmac, with more than 6,600 employees, is the UK’s leading sustainable building materials and construction solutions business. The company has over 330 UK sites from which it delivers contracting and highways maintenance services as well as products such as aggregates, asphalt, cement, lime and ready-mix concre
  • Tarmac secures major UK highways contract
    February 7, 2013
    Tarmac has been awarded a major US$94 million (£60mn) highways contract from Nottinghamshire County Council (CC) in central England. The contract, which involves the delivery of a wide range of highways services including resurfacing, gulley cleaning, street lighting, road marking and earthworks will see Tarmac’s National Contracting division working in partnership with the local authority’s in-house highways team. The agreement, which will start on 1 April 2013 and run until 31 March 2018 with a five-year
  • Highway Procurement: IRF Steps up to the plate to leverage long term value
    May 15, 2019
    Public procurement can be leveraged to deliver long-term value for money, and promote innovation and sustainability, according to a new White Paper published by the International Road Federation in consultation with key international specialists. “When procurement guidelines are not enforced with a high degree of professionalism, there is a much higher risk of sub-optimal delivery,” noted Eric Cook, co-chair of the IRF Committee on Alternative Financing & Procurement, who convened the stakeholders for a h